Permit: T07CM01507

Parcel: 12701005D

Inspection Status: Approved

Inspection History: PLUMBING - INTERMEDIATE

Permit Number - T07CM01507

Inspection Description - PLUMBING - INTERMEDIATE

Inspection Status - Approved

Date Description Inspector Results Comments
05/17/2007 PLUMBING - INTERMEDIATE Approved IVRS - Inspection :*
05/16/2007 PLUMBING - INTERMEDIATE Not ready for Inspection IVRS - Inspection :*
HAVE WORK COMPLETED PRIOR TO CALL IN FOR INSPECTION
05/02/2007 PLUMBING - INTERMEDIATE Partial Approval IVRS - Inspection :*
AIR TEST DRAIN & VENT OK
1. SHALL SEE FINAL
CONNECTION TO VENT & DRAIN
SINGLE 1/2" WATER DROP FROM FIXTURE STUBBED INTO HALLWAY AIR TEST OK
2. SHALL PROVIDE BOTH WATER DROPS PER PLAN OR PROVIDE REVISED APPROVED PLAN OF YOUR INSTALLATION
3. 2" DRAIN ARM SHALL REQUIRE 2" P-TRAP FOR FIXTURE AT FINAL.
4. PIPING PASSING THRU FLOOR & WALLS REQUIRES CORRECT SEALING FOR APPLICATION

NOTE: FIREWALL & FLOOR SEPARATIONS REQUIRE FIRE STOP SYSTEMS.