Inspection History Details
Inspection Status: Approved
Inspection History: ENGINEERING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 01/14/2008 | ENGINEERING - FINAL | Approved | ||
| 01/08/2008 | ENGINEERING - FINAL | Partial Approval | OK FOR TEMP C OF O 1. BACKFILL AT ELECTRICAL TRANSFORMER 2. PATCH ASPHALT REPAIR FOR ELECTRICAL UNDERGROUND. MATCH EXISTING ASPHALT. |