Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit: T07CM01190

Parcel: 118051060

Inspection Status: Approved

Inspection History: PLUMBING - GAS PRESSURE TEST

Date Description Inspector Results Comments
03/09/2009 PLUMBING - GAS PRESSURE TEST Approved IVRS - Inspection :*
03/05/2009 PLUMBING - GAS PRESSURE TEST Partial Approval IVRS - Inspection :*
03/04/2009 PLUMBING - GAS PRESSURE TEST Denied IVRS - Inspection :
See detailed listing on site.| 999*
1) SOIL LINES NOT DONE PER CODE, TALKED WITH CONTRACTOR AS TO CORRECTIONS, VENT EACH FIXTURE, NO SAN TEE'S TO BE LYING ON BACK, PEE TRAP AT WASHER, WITH CLEANOUT REQUIRED AT KIT SINK
2) GAS CALC 3/4" TRUNK GOOD FOR H20 HTR AND FURNACE ONLY-NOT RANGE
3) USE LONG SEEP VERTICAL TO HORIZONTAL