Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - ABOVE CEILING
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/02/2008 | PLUMBING - ABOVE CEILING | Approved | IVRS - Inspection :* 1. ABOVE CEILING OK TO COVER 2. STILL NEED TO SEE CLOSET FLANGES AFTER FLOOR IS TILED -- REMEMBER CLOSET FLANGES TO EXTEND 1/4" ABOVE FINISHED FLOOR. |
|
| 02/28/2008 | PLUMBING - ABOVE CEILING | Not ready for Inspection | IVRS - Inspection :* 1. PLAN CALLS FOR CLEVIS HANGERS, GALVANIZED SHIELDS, HAND SECTIONS AT EACH HANGER. INSTALLED IS UNISTRUT RACKS AND INSULATION IS NOT CONTINUOUS. 2. INSTALL HANGERS AT REAR CLASSROOM AND ON WATER SERVICE OVERHEAD 3. OK TO COVER WALLS TO OVERHEAD OK TO COVER OVERHEAD IN RESTROOMS |
|
| 02/05/2008 | PLUMBING - ABOVE CEILING | Not ready for Inspection | IVRS - Inspection :* |