Permit: T07CM01134

Parcel: 123030590

Inspection Status: Approved

Inspection History: PLUMBING - ROUGH, SOIL

Date Description Inspector Results Comments
09/06/2007 PLUMBING - ROUGH, SOIL Approved IVRS - Inspection :*
08/30/2007 PLUMBING - ROUGH, SOIL Partial Approval IVRS - Inspection :*
1. PCWWM INSPECTED RIGHT OF WAY AND STREET PIPING AS INITIALED ON C1.3
2. SEWER HCS IS COMPLETE
3. SEWER FROM CLASSROOM #5 TO WEST SIDE OF BREEZEWAY OK. N/H TO FIVE FEET OUTSIDE BLDG.
4. WATER TEST OK
08/28/2007 PLUMBING - ROUGH, SOIL Partial Approval IVRS - Inspection :*
REPAIR AT CLASSROOM #8 MADE OK
1. 4" N/HUB INSTALLED UNDER BLDG SCH 40 PVC UNDERGROUND TRUNK LINE EXTENDED TO CLASSROOM #5 AS HIGHLIGHTED ON P1.1 OK TO COVER
07/31/2007 PLUMBING - ROUGH, SOIL Partial Approval IVRS - Inspection :*
- SEWER FROM PROPERTY LINE TO BLDG #9 OK TO COVER
- 2" PVC YARDWATER PARTIAL FROM PL TO BETWEEN
BLDG #8 & 9 OK TO COVER
- AS HIGHLIGHTED ON PLAN C1.3
07/20/2007 PLUMBING - ROUGH, SOIL Not ready for Inspection IVRS - Inspection :*
07/18/2007 PLUMBING - ROUGH, SOIL Partial Approval IVRS - Inspection :*
1. PLAN ALLOWS SDR35
SOLVENT WELD FITTINGS REQUIRE APPROVED PRIMER
MAKE ALL CONNECTIONS TEST ALL PIPE
2. HB2256 REQUIRES ALL NON-METALLIC UTILITIES TO HAVE TRACER WIRE