Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Inspection Status: Approved

Inspection History: PLUMBING - ABOVE CEILING

Date Description Inspector Results Comments
06/12/2008 PLUMBING - ABOVE CEILING Approved IVRS - Inspection :*
05/16/2008 PLUMBING - ABOVE CEILING Partial Approval IVRS - Inspection :*
HARD LIDS OK
PERM CAP FUTURE ABS DRAINS
ELIMINATE PVC USED FOR TEST
02/27/2008 PLUMBING - ABOVE CEILING Denied IVRS - Inspection :
See detailed listing on site.| 999*
#105 IS SOUTHERN HALF OF BUILDING

- TRAP ARM FOR SINK IN EXAM RM 2 EXCEEDS MAX
- TRAP ARM LENGTH FOR 1 1/2" PIPE
ALSO, PROVIDE 1/4" PER FOOT SLOPE
- REVENTS ABV CEILING NOT PROPERLY SUPPORTED OR SLOPED
- ABV CEILING WASTE PIPING FOR 2ND LEVEL IS NOT UNDER TEST AND DOES NOT HAVE MIN. REQUIRED SLOPE
- EXAM RM 8 AND P-6 IN CORR. 119 NOT UNDER TEST AND ABS IS RUBBING AGAINST SHARP METAL
- TR129 PIPING NOT SECURE IN WALL AND RUBBIN AGAINST SHARP METAL
- SECURE ALL PIPING MIDSTORY AND SUPPORT & SECURE HORIZONTAL PIPING IN WALLS BR28 ONLY
OK TO COVER