Inspection History Details
Inspection Status: Approved
Inspection History: ENGINEERING - FINAL
Permit Number - T07CM01074
Inspection Description - ENGINEERING - FINAL
Inspection Status - Approved
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/27/2009 | ENGINEERING - FINAL | Approved | Contractor provided letter from engineer. | |
| 04/23/2009 | ENGINEERING - FINAL | Partial Approval | CONTRACTOR NEEDS TO PROVIDE SITE CERT. | |
| 04/21/2009 | ENGINEERING - FINAL | Partial Approval | PARTIAL APPROVAL CONTRACTOR NEEDS TO: 1) STABILIZE ALL AREAS DISTURBED BY CONSTRUCTION 2)REMOVE ALL PORT-A-POTTYS, DEBRIS, EQUIPMENT, DUMPSTERS AND MATERIALS FROM SITE 3) ADDRESS BASIN WALLS 4) INSTALL H.C. PARKING SIGNS 5) INSTALL WHEEL STOPS PER COT D.S. 6)SEPARATE ALL CONSTRUCTION FROM PUBLIC ACCESS 7) PROVIDE SITE CERT. FROM ENGINEER PER COT DRAINAGE MANUAL CHAPTER XIV SECTION 14.2 (7) 3)A |