Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - ROOF DRAINS
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 03/30/2009 | PLUMBING - ROOF DRAINS | Approved | IVRS - Inspection :* | |
| 02/24/2009 | PLUMBING - ROOF DRAINS | Partial Approval | IVRS - Inspection :* | |
| 02/23/2009 | PLUMBING - ROOF DRAINS | Partial Approval | IVRS - Inspection :* 1. COMPLETE INSTALL OF SUPPORTS ON ALL PIPING 2. ROOF DRAIN FOR BUILDING TEST OK |
|
| 02/20/2009 | PLUMBING - ROOF DRAINS | Partial Approval | IVRS - Inspection :* 1. PROVIDE SUPPORT IN WALL ON ALL PIPING 2. PROVIDE TEST ON SOUTHSIDE ROOF DRAIN NORTHSIDE TEST OK |
|
| 02/19/2009 | PLUMBING - ROOF DRAINS | Not ready for Inspection | IVRS - Inspection :* REPAIR LEAK BEFORE CALL FOR INSPECTION |
|
| 02/18/2009 | PLUMBING - ROOF DRAINS | Partial Approval | IVRS - Inspection :* 4" RD & OFRD NORTH LOCATION WATER TEST OK 4" OFRD SOUTH LOCATION WATER TEST OK 1. 4" RAIN DRAIN SOUTH LOCATION REQUIRED TO BE FULL OF WATER FOR TEST AND ALL LOCATIONS REQUIRE HORIZONTAL SUPPORT AND CORRECT INSTALL PER NOTE #9 PAGE P1. |