Inspection History Details
Inspection Status: Approved
Inspection History: ELECTRIC - ABOVE CEILING
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/23/2009 | ELECTRIC - ABOVE CEILING | Approved | IVRS - Inspection :* | |
| 04/20/2009 | ELECTRIC - ABOVE CEILING | Partial Approval | IVRS - Inspection :* | |
| 04/17/2009 | ELECTRIC - ABOVE CEILING | Partial Approval | IVRS - Inspection :* | |
| 04/14/2009 | ELECTRIC - ABOVE CEILING | Partial Approval | IVRS - Inspection :* | |
| 04/13/2009 | ELECTRIC - ABOVE CEILING | Denied | IVRS - Inspection : The wiring is not complete or does not comply with code.| 245* INSTRUCTIONS ALLOW CHANGE OF LUG KIT IN MAIN SWITCHBOARD NO NRTL WILL BE NEEDED 1. NEED LETTER OF TORQUE 2. CONDUCTORS TO BE AS PER 408.3 3. BOND CONDUIT END PER 250.64 ABOVE SWITCH BOARD |
|
| 04/10/2009 | ELECTRIC - ABOVE CEILING | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1. NEED TO PROVIDE LETTER OF TORQUE 2. NEED TO LACE INCOMING CABLE PER INSTRUCTIONS 3. HAVE INSTRUCTIONS AVAILABLE FOR LUG 4. RECESSED FIXTURES TO BE ATTACHED TO GRID 5. CLOSE OPEN JUNCTION BOXES 6. EXITS TO HAVE SEISMIC WIRE 7. MC CABLES TO BE SECURED WITHIN 12" OF BOXES 8. 2X4 FIXTURES TO BE ATTACHED TO GRID USE ALL 4 CLIPS |
|
| 04/06/2009 | ELECTRIC - ABOVE CEILING | Partial Approval | IVRS - Inspection :* | |
| 02/27/2009 | ELECTRIC - ABOVE CEILING | Partial Approval | IVRS - Inspection :* | |
| 02/26/2009 | ELECTRIC - ABOVE CEILING | Not ready for Inspection | IVRS - Inspection :* | |
| 02/25/2009 | ELECTRIC - ABOVE CEILING | Partial Approval | IVRS - Inspection :* | |
| 02/23/2009 | ELECTRIC - ABOVE CEILING | Partial Approval | IVRS - Inspection :* |