Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 12/08/2008 | PLUMBING - FINAL | Approved | IVRS - Inspection :* | |
| 12/04/2008 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* SUPPORT MV VALVE AT WH DRIP ON UNION AT RPA CAULK DFS |
|
| 12/01/2008 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* CALL FOR AND HAVE APPROVED ALL REQUIRED INSPECTIONS PRIOR TO FINAL. REVIEW INSP. HISTORY FOR LOOSE ENDS AND COMPLETE WORK. |
|
| 11/28/2008 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* 1. NEED TO SEE RP CONN TO PIPING. 2. UNWRAP PIPING TO CHECK MATERIAL TYPE. 3. RP REQUIRES UNIONS. 4. PROVIDE APPROVED PLAN REVISIONS 5. PROVIDE CLEARANCE REQUIRED FOR PEX AT WH 18" - 604.11.2 6. PROVIDE TEMPERING OF HW PER UPC 414.1 7. PROVIDE STERILIZATION AND PAPER WORK PER UPC 609.9 8. CAULK FIXTURES 9. LOCATE CO AT SINK 10. CORRECT CRITICAL LEVEL ON URINAL FLUSH-O-METER 11. PROTECT PLASTIC VTRS 12. PROVIDE A SEPARATE SOV FOR DW |