Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - ROUGH, SOIL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 03/21/2007 | PLUMBING - ROUGH, SOIL | Approved | IVRS - Inspection :* | |
| 03/19/2007 | PLUMBING - ROUGH, SOIL | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1) 3" CLEANOUT REQUIRED FIRST FLOOR PER PLAN 2) BACK WATER VALVE NEEDED FOR FIRST FLOOR (NOW ON 2ND FLOOR) 3) NEED WATER METER |