Inspection History Details
Inspection Status: Approved
Inspection History: FRAMING
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 03/06/2009 | FRAMING | Approved | IVRS - Inspection :* | |
| 02/06/2009 | FRAMING | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1) SECURE COPPER 8' ON CENTER THROUGHOUT 2) SECURE COPPER STUB OUTS 3) TERMINATE ROMEX IN EXHAUST FANS 4) TERMINATE EXHAUST TO EXTERIOR 5) INSTALL ALL MECH BOOTS/BLOCK 3 SIDES 6) NAIL PROTECT PLUMBING AND ELECTRIC THROUGHOUT 7) INSULATE "4" FITTING 8) INSTALL CANS PER PLAN 9) BOND GAS AND COPPER |
|
| 07/16/2008 | FRAMING | Not ready for Inspection | IVRS - Inspection :* 1) PROVIDE SAFE ACCESS TO ROOF |