Permit: T07CM00995

Parcel: 114600820

Inspection Status: Approved

Inspection History: ENGINEERING - FINAL

Permit Number - T07CM00995

Inspection Description - ENGINEERING - FINAL

Inspection Status - Approved

Date Description Inspector Results Comments
01/09/2008 ENGINEERING - FINAL Approved
12/28/2007 ENGINEERING - FINAL Denied SEE PREVIOUS COMMENTS 2,3 5,7 AND 9 OF PREVIOUS INSPECTION .
12/26/2007 ENGINEERING - FINAL Cancelled NOT READY, CANCELED BY CONTRACTOR.
12/24/2007 ENGINEERING - FINAL Cancelled NOT READY, CANCELED BY CONTRACTOR.
11/21/2007 ENGINEERING - FINAL Partial Approval OK FOR TEMPORARY C OF O FOR FIXTURING AND STOCKING ONLY.
1. PROVIDE ARIZONA REGISTERED P.E. CERTIFICATION FOR THE REMAINING PORTION OF THIS PROJECT. (54-57 + ... ETC.)
2. PROVIDE 5% SLOPE ON DRAINAGE INLET AND R/D BASIN ACCESS. WATER NEEDS TO FLOW INTO THE BASIN, NOT ACROSS THE EASTERN SLOPE.
3. CONSTRUCT DRAINAGE STRUCTURE AT NORTH END OF BASIN TO THE PLAN SPECS. (SEE DETAIL U-7).
4. PROVIDE BICYCLE PARKING.
5. PROVIDE COMPLETE UPDATE OF RED LINED GRADING PLAN WITH COMPLETED BUILDINGS FOOTPRINTS.
6. VERIFY THAT THE R/D BASIN DOES NOT HOLD WATER OVER 12 HOURS.
7. PROVIDE 24' PAAL AT DRIVEWAY ENTRANCE TO AVENIDA VALIENTE. (CURRENT PAAL IS 23')
8. ADDRESS RAINWATER DISCHARGE TO THE HANDICAP RAMP (SEE PAVING NOTE #9 ON THE GRADING PLAN).
9. REPAIR DAMAGED ASPHALT.
11/19/2007 ENGINEERING - FINAL Denied 1. PROVIDE ARIZONA REGISTERED P.E. CERTIFICATION FOR THE REMAINING PORTION OF THIS PROJECT. (54-57 + ... ETC.)
2. PROVIDE 5% SLOPE ON DRAINAGE INLET AND R/D BASIN ACCESS. WATER NEEDS TO FLOW INTO THE BASIN, NOT ACROSS THE EASTERN SLOPE.
3. CONSTRUCT DRAINAGE STRUCTURE AT NORTH END OF BASIN TO THE PLAN SPECS. (SEE DETAIL U-7).
4. PROVIDE BICYCLE PARKING.
5. PROVIDE COMPLETE UPDATE OF RED LINED GRADING PLAN WITH BUILDING FOOTPRINTS.
6. VERIFY THAT THE R/D BASIN DOES NOT HOLD WATER OVER 12 HOURS.
11/16/2007 ENGINEERING - FINAL Not ready for Inspection CANCELLED BY CONTRACTOR