Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/10/2008 | PLUMBING - FINAL | Approved | IVRS - Inspection :* | |
| 09/08/2008 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* 1. FINISH INSULATING RETURN PIPING AT W.H 2. 2 COMPARTMENTS OF 3-COMP SINK DRAIN 3. ADD CLEANOUTS AT TRAP ARMS OVER 90 DEG. 4. HOOK UP ALL EQUIPMENT MAKE ALL CONNECTIONS 5. FINISH HOOKING UP JANITORS SINK AT G.T |
|
| 09/02/2008 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* 1. ICE MAKER/STORAGE BIN DRAINS MAY NOT BE COMBINED 2. RP DEVICE MAY NOT BE REDUCED 3. MINIMUM 1" AIR GAP 4. GREATER THAN FIVE FEET IW PIPING TO BE DIRECTLY TRAPPED 5. ALL PIPING TO BE SUPPORTED INSTALLED IN A WORKMANSHIP LIKE MANNER 6. 2-COMPS OF 3-COMP SINK TO BE DIRECTLY CONNECTED 7. MOVEABLE GAS APPLIANCES TO HAVE QUICK DISCONNECT AND CABLE RESTRAINT 8. TRAP ARM MAY ONLY CHANGE DIRECTION 90 DEG. W/O ADDING A CLEANOUT 9. IW PIPING TO BE APPROVED MATERIAL AIR GAP ENFORCED 10. H.C BOWL TO BE 17 1/2" OPEN FRONT SEATS 11. CLEAN BACTERIA REPORT 12. CERTIFICATION OF BACKFLOW DEVICES |