Date Description Inspector Results Comments
06/13/2008 EXCAVATION/LAYOUT REBAR & ZON Approved IVRS - Inspection :*
11/01/2007 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection :*
BALANCE OF NORTH RETAINING WALL FOOTING
10/22/2007 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection :*
ALL PLASTER STEMS COMPLETE
10/19/2007 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection :*
RETAIN WALL & COL. FOOTINGS
NW CORNER BY MECH.
10/12/2007 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection :*
2 - 7' CONCRETE PIERS @ WEST SIDE OF YARD AS
PER SHEET S4/111

2 - CONCRETE PIERS @ SOUTH SIDE OF YARD AS
PER SHEET S3/105
10/03/2007 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection :*
HEAD WALL @ NW CORNER OF PLAN & PLASTER PER S4/111
09/21/2007 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection :*
6 - CONCRETE PIPE SUPPORT FOOTING AS
PER S4/111 AND S3/105
06/19/2007 EXCAVATION/LAYOUT REBAR & ZON Denied IVRS - Inspection :
There is no plan or job inspection card on site.| 925*
UNABLE TO LOCATE JOB (945), NO SUPERINTENDENT ON JOB,
NO CONTACT NUMBER. NO PLANS OR JOB INSPECTION
CARD (925) ON SITE.
05/07/2007 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection :*
THIS INSPECTION COVERS 3 FOOTINGS ON NEW ON STAIRWAY
IN COMPLIANCE WITH SPECIFIC DETAIL ON SHEET S4.0/105
04/19/2007 EXCAVATION/LAYOUT REBAR & ZON Denied IVRS - Inspection :
See detailed listing on site.| 999*
1. PROVIDE SPECIFIC DETAIL AND APPROVED PLANS
RFI NEED TO BE APPROVED STAMP FOR DSD CITY OF TUCSON AND ENGINEER.
2. FOR EPOXY CONNECTIONS PROVIDE SPECIAL INSPECTION REPORT
3. RFI WITHOUT DSD CITY OF TUCSON APPROVAL DO NOT REPRESENT WORK ON SITE REGARDING CONNECTION WITH EXISTING FOUNDATION.
04/04/2007 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection :*
NOTE:
1. APPROVED PLANS NEED TO BE KEPT AT THE SITE OF WORK IN ACCORDANCE WITH THE SECTION 106.3.1 OF THE IBC
2. PROVIDE NEW REVISION ON LAYOUT LOCATION OF FOOTING
3. PARTIAL APPROVAL FOR 3 PAIR OF FOOTINGS IN COMPLIANCE WITH DETAIL 105 ON SHEET S2.0
3 PAIR OF FOOTINGS 8' O.C PLUS
2 PAIR OF FOOTING ON WEST SIDE IN SAME CONDITION OF THE DETAIL 105 ON SHEET S2.0
04/02/2007 EXCAVATION/LAYOUT REBAR & ZON Denied IVRS - Inspection :
See detailed listing on site.| 999*
NO SUPERINTENDENT ON JOB SITE TO PROVIDE ACCESSIBILITY TO JOB SITE IN ACCORDANCE WITH THE SECTION 109.1 OF IBC