Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Approved
Inspection History: EXCAVATION/LAYOUT REBAR & ZON
Permit Number - T07CM00928
Inspection Description - EXCAVATION/LAYOUT REBAR & ZON
Inspection Status - Approved
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
06/13/2008 | EXCAVATION/LAYOUT REBAR & ZON | Approved | IVRS - Inspection :* | |
11/01/2007 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection :* BALANCE OF NORTH RETAINING WALL FOOTING |
|
10/22/2007 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection :* ALL PLASTER STEMS COMPLETE |
|
10/19/2007 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection :* RETAIN WALL & COL. FOOTINGS NW CORNER BY MECH. |
|
10/12/2007 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection :* 2 - 7' CONCRETE PIERS @ WEST SIDE OF YARD AS PER SHEET S4/111 2 - CONCRETE PIERS @ SOUTH SIDE OF YARD AS PER SHEET S3/105 |
|
10/03/2007 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection :* HEAD WALL @ NW CORNER OF PLAN & PLASTER PER S4/111 |
|
09/21/2007 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection :* 6 - CONCRETE PIPE SUPPORT FOOTING AS PER S4/111 AND S3/105 |
|
06/19/2007 | EXCAVATION/LAYOUT REBAR & ZON | Denied | IVRS - Inspection : There is no plan or job inspection card on site.| 925* UNABLE TO LOCATE JOB (945), NO SUPERINTENDENT ON JOB, NO CONTACT NUMBER. NO PLANS OR JOB INSPECTION CARD (925) ON SITE. |
|
05/07/2007 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection :* THIS INSPECTION COVERS 3 FOOTINGS ON NEW ON STAIRWAY IN COMPLIANCE WITH SPECIFIC DETAIL ON SHEET S4.0/105 |
|
04/19/2007 | EXCAVATION/LAYOUT REBAR & ZON | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1. PROVIDE SPECIFIC DETAIL AND APPROVED PLANS RFI NEED TO BE APPROVED STAMP FOR DSD CITY OF TUCSON AND ENGINEER. 2. FOR EPOXY CONNECTIONS PROVIDE SPECIAL INSPECTION REPORT 3. RFI WITHOUT DSD CITY OF TUCSON APPROVAL DO NOT REPRESENT WORK ON SITE REGARDING CONNECTION WITH EXISTING FOUNDATION. |
|
04/04/2007 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection :* NOTE: 1. APPROVED PLANS NEED TO BE KEPT AT THE SITE OF WORK IN ACCORDANCE WITH THE SECTION 106.3.1 OF THE IBC 2. PROVIDE NEW REVISION ON LAYOUT LOCATION OF FOOTING 3. PARTIAL APPROVAL FOR 3 PAIR OF FOOTINGS IN COMPLIANCE WITH DETAIL 105 ON SHEET S2.0 3 PAIR OF FOOTINGS 8' O.C PLUS 2 PAIR OF FOOTING ON WEST SIDE IN SAME CONDITION OF THE DETAIL 105 ON SHEET S2.0 |
|
04/02/2007 | EXCAVATION/LAYOUT REBAR & ZON | Denied | IVRS - Inspection : See detailed listing on site.| 999* NO SUPERINTENDENT ON JOB SITE TO PROVIDE ACCESSIBILITY TO JOB SITE IN ACCORDANCE WITH THE SECTION 109.1 OF IBC |