Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - ROUGH, SOIL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/18/2007 | PLUMBING - ROUGH, SOIL | Approved | IVRS - Inspection :* | |
| 06/15/2007 | PLUMBING - ROUGH, SOIL | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1) CORRECT SLOPE AT SINK 2) CORRECT GLUE JOINTS ON 4" COMBO 3) INSTALL MISSION COUPLINGS IN PROPER ALIGNMENT 4) TEST WYES SHALL BE INSTALLED IN CORRECT DIRECTION OF FLOW 5) TEST ON DWV IS OK 6) INSTALL HW AND CW ON CORRECT SIDE |