Inspection History Details
Inspection Status: Approved
Inspection History: ENGINEERING - FINAL
Permit Number - T07CM00814
Inspection Description - ENGINEERING - FINAL
Inspection Status - Approved
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
08/03/2007 | ENGINEERING - FINAL | Approved | Contractor completed punch list. | |
07/27/2007 | ENGINEERING - FINAL | Denied | Contractor needs to: 1- Complete all construction activity around building. 2- Remove trash dumpster and port-a-potty. 3- Clean mud and wash out from parking lot. 4- Complete HC parking, per approved drawings. (trucated domes needed). Engineer needs to address trucated domes placement. 5- Install all bike parking. 6- Complete all striping in parking area, per approved drawings. 7- Remove temp fencing. 8- Engineer needs to address all changes to the approved drawings. 9- Engineer needs to address PAAL width, less then 15'. 10- Remove all construction debris. 11- Complete all site work. |