Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 01/30/2008 | PLUMBING - FINAL | Approved | IVRS - Inspection :* CORRECTIONS MADE OK PLUMBING FINAL OK |
|
| 01/23/2008 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* | |
| 01/14/2008 | PLUMBING - FINAL | Not ready for Inspection | 1. AT 3-COMP SINK: PROVIDE ACCESS TO DIELECTRIC UNIONS PROVIDE APPROVAL FOR PEX IN LIEU OF COPPER TYPE "L" TEST OK OK TO COVER FLOOR AND WALL AT THIS AREA 2. HAND SINK OK 3. GAS CAPPED OK 4. INSTALL P-1 AT PREP SINK 5. WET VENTED SECTION TO BE 2" 6. PROVIDE DIELECTRIC PROTECTION AT WATER HEATER SUPPORT EXPANSION TANK |
|
| 01/10/2008 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* 1. NO CHANGE FROM LAST INSPECTION 2. CONTRACTOR TO PAY REINSPECTION FEE |
|
| 01/09/2008 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* 1. CAP OFF GAS IN AN APPROVED MANNER AT RANGE DEMO 2. EXPOSE UNDER FLOOR WORK 3. TWO COMPARTMENTS OF 3-COMP SINK TO BE DIRECTLY CONNECTED TO SANITARY SEWER. 3RD COMPARTMENT (SANITIZING BOWL TO BE INDIRECTLY CONNECTED) 4. HAND SINK TO BE DIRECTLY CONNECTED TO SANITARY SEWER 5. COPPER TO BE SUPPORTED IN AN APPROVED MANNER 6. AT EXISTING FOOD PREP/HAND SINK UNDER CABINET PLUMBING NOT APPROVED |