Permit: T07CM00754

Parcel: 11460019C

Inspection Status: Approved

Inspection History: PLUMBING - ROUGH, SOIL

Permit Number - T07CM00754

Inspection Description - PLUMBING - ROUGH, SOIL

Inspection Status - Approved

Date Description Inspector Results Comments
01/15/2008 PLUMBING - ROUGH, SOIL Approved
07/25/2007 PLUMBING - ROUGH, SOIL Partial Approval IVRS - Inspection :*
CWV COMPLETE. ROUGH SOIL PIPING COMPLETE
NEED APPROVED REVISED PLANS FOR FINAL APPROVAL
HAVE REDLINED PLANS ON SITE FOR COMPARISON
INCLUDE ALL CHANGES AND ADDITIONAL FIXTURES
07/24/2007 PLUMBING - ROUGH, SOIL Partial Approval IVRS - Inspection :*
DW & PAN WASHER IN BAKERY DELI
FS AND IN WALLS OK TO COVER
07/23/2007 PLUMBING - ROUGH, SOIL Not ready for Inspection IVRS - Inspection :*
07/20/2007 PLUMBING - ROUGH, SOIL Partial Approval IVRS - Inspection :*
DELI AND BAKERY GREASE AND SANITARY SOIL PIPING OK TO COVER
07/13/2007 PLUMBING - ROUGH, SOIL Partial Approval IVRS - Inspection :*
FS ADDED AT OVEN LOCATION REVISION REQ
GAS LINE PER ROD LINES TEST OK
06/29/2007 PLUMBING - ROUGH, SOIL Partial Approval IVRS - Inspection :*
CWV -- FS'S AT CHEESE CASE, CAKE TABLE, CAKE WORK AREA AND HS -- GW CONTINUATION TO COL. C LOCATION
06/28/2007 PLUMBING - ROUGH, SOIL Partial Approval IVRS - Inspection :*
FLOOR SINKS AT FLORAL STORAGE OK
GREASE INTERCEPTOR INSTALLED PER REDLINES, TIED INTO EXISTING 4" CLAY SEWER. PROVIDE APPROVED REVISION FOR FINAL
06/25/2007 PLUMBING - ROUGH, SOIL Partial Approval IVRS - Inspection :*
GW MEAT DEPT TO NEW INTERCEPTOR LOCATION
HS INSTALLED ON DOMESTIC WASTE
06/21/2007 PLUMBING - ROUGH, SOIL Partial Approval IVRS - Inspection :*
FS AT COL D9 OK
INSTALL CLEANOUT AND FOAM WRAP
06/14/2007 PLUMBING - ROUGH, SOIL Partial Approval IVRS - Inspection :*
1) CMU AT COL 8 DAIRY AND PRODUCE, ISLAND VENT AT FLORAL OK TO COVER
06/12/2007 PLUMBING - ROUGH, SOIL Partial Approval IVRS - Inspection :*
4 FS RELOCATED AT FROZEN FOOD CASE
06/08/2007 PLUMBING - ROUGH, SOIL Partial Approval IVRS - Inspection :*
FS AT JUICE COOLER AND TIE IN FOR PRODUCE COOLER OK
06/06/2007 PLUMBING - ROUGH, SOIL Partial Approval IVRS - Inspection :*
1. VTR OK AT BEV AND FROZEN FOOD CASES
2. MAKE CO'S WATER & GAS TIGHT
3. FS'S OK AT FROZEN FOOD CASE
4. 3-COMP SINK ROUGH SOIL AT PRODUCE PREP AND DAIRY COOLERS OK
5. WATER LINES OVERHEAD FOR STARBUCKS REQUIRE SUPPORTS NOT TO EXCEED 6'
06/04/2007 PLUMBING - ROUGH, SOIL Partial Approval IVRS - Inspection :*
CWV, FROZEN FOOD THROUGH STARBUCKS AND TO DELI LOCATION.

3/4" L WATER LINES FROM DELI TO STARBUCKS OK
06/01/2007 PLUMBING - ROUGH, SOIL Partial Approval IVRS - Inspection :*
4" CWV FOR BEVERAGE CASE ONLY (3) FLOOR SINKS INSTALLED PER REDLINE ON PAGE P1.1 WITH 3" VENT TO 10' OK
05/31/2007 PLUMBING - ROUGH, SOIL Denied IVRS - Inspection :
See detailed listing on site.| 999*
RYAN (806) 517-0454 SUPER
JOHN W/H2O PLUMBING
PROVIDE UNIFORM SLOPE THROUGHOUT
REDLINE CHANGES ON PLAN PRIOR TO INSPECTION.