Inspection History Details
Inspection Status: Approved
Inspection History: EXT METAL CLIPS/EXT SHEATHING
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/30/2007 | EXT METAL CLIPS/EXT SHEATHING | Approved | IVRS - Inspection :* | |
| 04/26/2007 | EXT METAL CLIPS/EXT SHEATHING | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1) INSTALL H2.5'S /H3'S STUDS TO TOP AND BOTTOM PLATES 2) CHECK ALL SHINERS-RENAIL 3) STRAP ALL BEAMS HEADERS AT BEARING 4) SHIM GAPS UNDER HEADERS AT BEARING 5) PLATE BOLTS AT SHEARWALL NOT PER PLAN 6) NEED CITY OF TUCSON APPROVED TRUSS DRAWINGS 7) STOPPED INSPECTION |