Inspection History Details
Inspection Status: Approved
Inspection History: ENGINEERING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 11/30/2007 | ENGINEERING - FINAL | Approved | Contractor to install bicycle next week and complete stairs | |
| 10/25/2007 | ENGINEERING - FINAL | Partial Approval | OK FOR TEMP C OF O COMPLETE ALL PREVIOUS PUNCHLIST ITEMS. 1. C OF O NOT TO BE GIVEN UNTIL THE FINAL GRADING INSPECTION #09190 FOR T04BU00386 IS COMPLETED AND APPROVED. 2. PROVIDE A LETTER FROM THE AZ REGISTERED P.E. THAT CERTIFIES THAT THE PROJECT AND ALL DRAINAGE IS CONSTRUCTED TO THE revised GRADING PLANS. 3. FINAL GRADING INSPECTION WILL BE PERFORMED USING THE C.O.T APPROVED (revised) GRADING PLAN. 4. COMPLETE ALL SITE WORK. 5. PROVIDE ALL BICYCLE PARKING. 6. REMOVE EXCESS CONSTRUCTION ROLLOFFS AND STORAGE YARDS. 7. REPAIR DAMAGED ASPHALT PAVING INCLUDING PONDING WATER AREAS. |
|
| 10/08/2007 | ENGINEERING - FINAL | Denied | 1. C OF O NOT TO BE GIVEN UNTIL THE FINAL GRADING INSPECTION #09190 FOR T04BU00386 IS COMPLETED AND APPROVED. 2. PROVIDE A LETTER FROM THE AZ REGISTERED P.E. THAT CERTIFIES THAT THE PROJECT AND ALL DRAINAGE IS CONSTRUCTED TO THE revised GRADING PLANS. 3. FINAL GRADING INSPECTION WILL BE PERFORMED USING THE C.O.T APPROVED (revised) GRADING PLAN. 4. COMPLETE ALL SITE WORK. 5. PROVIDE ALL BICYCLE PARKING. 6. REMOVE EXCESS CONSTRUCTION ROLLOFFS AND STORAGE YARDS. |