Inspection History Details
Inspection Status: Approved
Inspection History: ELECTRIC - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/23/2007 | ELECTRIC - FINAL | Approved | IVRS - Inspection :* OK FINAL SUBJECT TO BUILDING INSPECTORS DETERMINATION OF FIRE STOPPING BETWEEN FLOORS |
|
| 10/22/2007 | ELECTRIC - FINAL | Denied | IVRS - Inspection : The wiring is not complete or does not comply with code.| 245* 1. TIGHTEN LOOSE FURNITURE CONNECTIONS FOR OFFICE FURNITURE 2. BOXES MORE THAN 1/4" FROM BOX TO SURFACE 314.20 3. MAINTAIN WORKING CLEARANCES AT WATER HEATER DISCONNECT 4. BOND FIRE ALARM ENCLOSURE 5. METAL SHIELDS NOT APPROVED FOR 314.20 6. 1/2 OF LIGHT IN FRONT OF PANELS IN HALL NOT WORKING 7. NEED ROOF ACCESS |
|
| 10/19/2007 | ELECTRIC - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999* SEE NOTES PREVIOUS INSPECTIONS, PLEASE HAVE PREVIOUS INSPECTOR SIGN OFF WHAT HAS BEEN APPROVED. PLEASE HAVE ELECTRICAL CONTR. ON SITE |
|
| 10/11/2007 | ELECTRIC - FINAL | Not ready for Inspection | IVRS - Inspection :* WORK CALLED IN BEFORE COMPLETED |