Inspection History Details
Inspection Status: Approved
Inspection History: ENGINEERING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 11/04/2008 | ENGINEERING - FINAL | Approved | ||
| 10/01/2008 | ENGINEERING - FINAL | Not ready for Inspection | 1) REMOVE ROLL-OFF CONTAINER FROM PARKING AREA. 2) REMOVE PORTABLE TOILET FROM PARKING AREA. 3) PROVIDE TWO HC PARKING SPACES PER PLAN. 4) STABILIZE SLOPES ON EAST AND SOUTH SIDE OF BLDG. CALL FOR RE-INSPECTION |