Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 02/14/2008 | PLUMBING - FINAL | Approved | IVRS - Inspection :* | |
| 02/05/2008 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* 1) THERE MAYBE NO SYSTEM VENT BETWEEN FLOW CONTROL AND GREASE TRAP 2) OK TO COVER HAND SINK 3) FLOOR SINK REQUIRES CLEANOUT |
|
| 01/30/2008 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* 1. DELTA SIX REVISION INDIRECTLY WASTES HAND SINK. THIS IS NOT PER PLUMBING CODE. UPC REQUIRES HAND SINK TO BE DIRECTLY CONNECTED TO SS 2. FLOW CONTROL VENT MAY NOT TERMINATE INSIDE KITCHEN 3. 2 COMPARTMENTS OF 3-COMP SINK TO BE TRAPPED AND VENTED 4. VENT FITTINGS BELOW FLOOD RIM TO BE DRAINAGE TYPE 5. REQUIRE STRAINERS AT FLOOR SINKS 6. I.W PIPING TO HAVE MINIMUM 1" AIR GAP |
|
| 01/17/2008 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* OK TO COVER SHAMPOO BOWLS |
|
| 01/11/2008 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* 1. AT SHAMPOO BOWL - EXCEPT IN THE CASE OF WYE BRANCH AND END OF THE LINE CLEANOUTS, CLEANOUTS SHALL BE INSTALLED ABOVE THE FLOW LINE OF THE PIPE NOTE: A BLAKE TEE IS LISTED AS A VERTICAL SURFACE WALL CLEANOUT 2. ALL FIXTURES ARE TO BE DIRECTLY CONNECTED TO SANITARY SEWER. ONLY "SPECIAL" WASTE MAY BE INDIRECTLY WASTED I.E SANITIZING BOWL, FOOD PREP ETC. 3. GAS CARD CAN BE RELEASED AFTER BOND HAS BEEN POSTED |
|
| 01/03/2008 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* 1. REMOVE COVER ON EWC 2. 2" CLEANOUTS REQUIRE 12" CLEARANCE IN FRONT REMOVE 2" TEST PLUG AND INSTALL COUNTER SUNK TAPPED PLUG W/MACHINE SCREW. REMOVE ALL CP CLEANOUT COVERS. 3. HAND SINK TO BE DIRECTLY CONNECTED TO SANITARY SEWER - DOES NOT MEET "SPECIAL WASTE" REQUIREMENT CONTINUED "NOT READY" WILL RESULT IN A REINSPECTION FEE |
|
| 10/23/2007 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* 1. SEE TABLE 6-2 2003 UPC BACK SIPHONAGE/BACK PRESSURE LOW HAZARD EQUALS DOUBLE CHEEK VALVE BACKFLOW PREVENTOR 2. SHAMPOO BOWLS NOT COMPLETE |
|
| 10/18/2007 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* |