Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - INTERMEDIATE
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/07/2007 | PLUMBING - INTERMEDIATE | Approved | IVRS - Inspection :* OK TO COVER ALL AREAS |
|
| 08/03/2007 | PLUMBING - INTERMEDIATE | Not ready for Inspection | IVRS - Inspection :* DOUBLE WYE MAY NOT BE INSTALLED IN THE HORIZONTAL POSITION |
|
| 07/31/2007 | PLUMBING - INTERMEDIATE | Partial Approval | IVRS - Inspection :* - REDLINES ON SITE - HORIZONTAL X HORIZONTAL CHANGE OF DIRECTION TO BE A SWEEP - DOUBLE SANTEE REQUIRES BARREL OF FITTING TO BE TWO PIPE SIZES LARGER THAN LARGEST INLET |
|
| 07/12/2007 | PLUMBING - INTERMEDIATE | Not ready for Inspection | IVRS - Inspection :* VERTICAL SUPPORT HORIZONTAL SUPPORT G.T FLOW CONTROL VENT INSPECTION STOPPED |
|
| 07/05/2007 | PLUMBING - INTERMEDIATE | Not ready for Inspection | IVRS - Inspection :* NORMALLY YOU HAVE 03005 ROUGH/SOIL APPROVED BEFORE INTERMEDIATE 2. GATE LOCKED NO ACCESS |