Inspection History Details
Inspection Status: Approved
Inspection History: ENGINEERING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/04/2007 | ENGINEERING - FINAL | Approved | ||
| 10/03/2007 | ENGINEERING - FINAL | Approved | ||
| 10/02/2007 | ENGINEERING - FINAL | Denied | 1. PROVICE RED LINES OF DRAINAG SWALES, FFE, AND SLOPE ON GRADING PLAN. 2. REPAIR ASPHALT DAMAGE AND TAMP SOLID. 3. PROVIDE STORMWATER SEDIMENT AND EROSION CONTROLS AT EDGE OF STABILIZED AREAS. 4. REMOVE SEDIMENT FROM CATCH BASIN. 5. PROVIDE LETER FROM THE ENGINEER THAT SHOWS ELIMINATION OF SIDEWALK AND SCUPPERS AND ADDITION OF OTHER SCUPPERS. |