Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/27/2007 | PLUMBING - FINAL | Approved | IVRS - Inspection :* PLUMBING FINAL OK |
|
| 07/12/2007 | PLUMBING - FINAL | Not ready for Inspection | RECEIVED (18) IN HOUSE BACKFLOW CERTIFICATIONS 1. H/C STOOL TO HAVE FLUSH HANDLE TO WIDE SIDE OF ROOM 2. PUBLIC LAVS TO HAVE SOME FORM OF TEMPERATURE CONTROL ON HOT SIDE BESIDES THE WATER HEATER (TEMPERING VALVE) 3. SECURE HOT WATER SUPPLY PIPING AT COUNTER SINK 4. ALL CLEANOUTS TO HAVE FACTORY TAPPED CLEANOUT PLUGS AND MACHINE SCREWS TO PREVENT UNSANITARY CONDITION. PLUGS TO BE GAS TIGHT. 5. SUPPORT & SECURE WATER HEATER EXPANSION TANK WITH APPROVED CLAMP 6. PROVIDE 1" AIR GAP FOR 3-COMP SINK DRAIN |