Inspection History Details
Inspection Status: Approved
Inspection History: ENGINEERING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/17/2007 | ENGINEERING - FINAL | Approved | ||
| 05/16/2007 | ENGINEERING - FINAL | Approved | ||
| 05/10/2007 | ENGINEERING - FINAL | Denied | NOT READY 1. CLEAN UP AND REMOVE ALL CONSTRUCTION MATERIAL AND DEBRIS. 2. BACKFILL FIRE SPRINKLER LINE AND REPLACE SIDEWALK PANEL. 3. REPLACE DAMAGED WHEEL STOPS. 4. REMOVE TRASH ROLL-OFFS. 5. PROVIDE C.O.T APPROVED PLAN FOR INSPECTION. 6. BURY EXPOSED LANDSCAPE IRRIGATION PIPES. |