Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - INTERMEDIATE
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/17/2007 | PLUMBING - INTERMEDIATE | Approved | IVRS - Inspection :* | |
| 04/09/2007 | PLUMBING - INTERMEDIATE | Partial Approval | IVRS - Inspection :* 1) INTERMEDIATE OK FOR ROOMS #110, #111 AND #112 |
|
| 03/22/2007 | PLUMBING - INTERMEDIATE | Partial Approval | IVRS - Inspection :* 1. BELOW FLOOR CLOSET BENDS AND CAPS OK 2. INSTALL SWEEPS ON TRAP ARM CHANGES OF DIRECTION. 3. INSULATE HW 4. PROVIDE ACCESS TO BOTH SHUT OFF VALVES LOCATED IN PLUMBING CHASE. 5. SECURE VENT ON LAVITORY WALLS 6. SAFETY PLATE ALL PIPING WITHIN 1 1/4" OF STUD FACE 7. SUPPORT OVERHEAD CU TO SHOWER AT 6' INTERVALS 8. AT P.5 USE MISSION COUPLINGS. 9. SUPPORT CAST IRON IN EXISTING TOILET ROOMS 10. REDLINE CHANGES ON PLAN I.E FIXTURE REPLACED AT EXISTING ALSO, CW TO SHOWER |
|
| 03/09/2007 | PLUMBING - INTERMEDIATE | Partial Approval | IVRS - Inspection :* SHOWER WASTE & VENT W/TEST TO ABV CEILING GRID 1ST FL CAP ALL OPEN SEWER PIPES TO PROTECT WORKERS MIKE W/BESTWAY |