Date Description Inspector Results Comments
01/16/2008 EXCAVATION/LAYOUT REBAR & ZON Approved IVRS - Inspection :*
NORTH PARKING LOT DUMPSTER ENCLOSURE
01/15/2008 EXCAVATION/LAYOUT REBAR & ZON Not ready for Inspection IVRS - Inspection :*
01/14/2008 EXCAVATION/LAYOUT REBAR & ZON Not ready for Inspection IVRS - Inspection :*
01/11/2008 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection :*
REAR DOUBLE SOUTH TRASH ENCLOSURE FOOTING
01/10/2008 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection :*
REAR NORTHEAST CORNER SITE WALL FOOTING
01/08/2008 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection :*
FOOTING FOR EAST SIDE DUMPSTER ENCLOSURE
01/07/2008 EXCAVATION/LAYOUT REBAR & ZON Not ready for Inspection IVRS - Inspection :*
01/04/2008 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection :*
LAST SIX LIGHT POLE BASES IN SOUTH/REAR PARKING LOT
12/31/2007 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection :*
LIGHT BASES (6 BASES) F-6,5,3 AND O-F, D, A9
12/06/2007 EXCAVATION/LAYOUT REBAR & ZON Cancelled IVRS - RI canceled
11/19/2007 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection :*
1. MAIN ENTRY POPOUT - TOPPED OUT
2. DRIVE THRU PIERS - TOPPED OUT
11/16/2007 EXCAVATION/LAYOUT REBAR & ZON Not ready for Inspection IVRS - Inspection :*
CONTRACTOR CANCELLED
11/14/2007 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection :*
DOCK RAMP
PRE-SLAB & REINFORCING STEEL
11/06/2007 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection :*
REINFORCEMENT STEEL @ PHARMACY DRIVE THRU PIERS
11/05/2007 EXCAVATION/LAYOUT REBAR & ZON Not ready for Inspection IVRS - Inspection :*
11/01/2007 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection :*
FOOTING @ GRID F/1.3 TO 2.1 -- OK TO POUR
10/29/2007 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection :*
TWO PILASTERS AT NORTH MAIN ENTRY
10/25/2007 EXCAVATION/LAYOUT REBAR & ZON Not ready for Inspection IVRS - Inspection :*
CONTRACTOR CANCELLED
10/18/2007 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection :*
3-LIGHT POLE BASES IN FRONT EAST PARKING LOT
10/01/2007 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection :*
FREEZER SLAB & WALLS AT S/E CORNER
09/28/2007 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection :*
TWO LIGHT POLE BASES IN FRONT (NORTH) LOT THAT WERE RE-POURED
09/26/2007 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection :*
STEM WALL REINFORCEMENT @ SOUTH WALL OF DOCK WELL
09/24/2007 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection :*
FOOTING/RETAINING WALL REINFORCEMENT @ SOUTH DOCK WELL WALL
09/20/2007 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection :*
1) NORTH & EAST REINFORCEMENT STEEL AT DOCK WELL WALLS
2) MASONRY WALLS-GRID LINES 1/D TO E-E/1 TO 2-E/4.5 TO 5-5/E TO D TO 4 ? AFF + 5/0 TO B.6 TO 8 FOOT AFF-5/B.6 TO A.1-A-A.1/1 TO 5-1/A TO B.6 TO 12 FOOT AFF
09/11/2007 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection :*
09/10/2007 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection :*
6 LIGHT POLE BASES IN NORTH/WEST (FRONT) PARKING LOT
09/06/2007 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection :*
9 - F1 COLUMN FOOTINGS AT FOLLOWING GRID LOCATIONS:
B/2 - B/3 - B/4 - C/2 - C/3 - C/4 - D/2 - D/3 & D/4 -- OK TO POUR
09/04/2007 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection :*
1 - F2 COLUMN FOOTING @ 5/D & F10 FOOTINGS @ 5/C-5/B & 5/A CONTINUOUS FOOTING @ GRIDLINE 5/D.5 TO A.1
08/30/2007 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection :*
1. CONTINUOUS FOOTING @ GRID LINE 1/ C TO E
2. COLUMN FOOTING F-2 @ 1-C
08/29/2007 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection :*
1. CONT. #WF1 WALL FOOTING FROM GRID A/1 TO C/1
FROM A/1 TO A/5 -- OK TO POUR
2. COLUMN FOOTINGS AT C/1 - B/1 - A/1.6 - A/2.3 - A/3.4 & A/4.3