Inspection History Details
Inspection Status: Approved
Inspection History: ELECTRIC - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 12/12/2007 | ELECTRIC - FINAL | Approved | IVRS - Inspection :* | |
| 12/06/2007 | ELECTRIC - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1. MUA #1 TO HAVE MIN #10 EQUIPMENT GROUND - NEC 250.122 2. MUA #1 DISCONNECT TO HAVE PROPER FRONT WORKING CLEARANCE - NEC 110.26 3. SERVICE RECEPTACLE FOR MUA TO BE WORKING, GFI PROTECTED AND REPLACE BROKEN COVER 4. PANEL DIRECTORYIES TO BE CORRECT, IDENTIFY EQUIPMENT PER PANEL DIRECTORIES 5. ALL LOADS TO ORIGINATE FROM PANELS PER PLAN 6. CHECK PREVIOUS CORRECTIONS TO MAKE SURE ALL COMPLETE |
|
| 11/14/2007 | ELECTRIC - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1. EMERGENCY LIGHTING TO BE ENERGIZED BY THE NORMAL LIGHTING CKT FOR THAT AREA CHECK HALL/ENTRY AREA 2. PANEL DIRECTORY'S TO BE CORRECT, ALSO DO NOT ABBREVIATE WORDS, BREAKERS TO BE NUMBERED ON ROOF 1. AC "2" DISCONNECT TO HAVE PROPER FRONT WORKING CLEARANCE - 30" WIDE, 36" DEEP -- NEC 110.26 2. "CU-1" NEEDS MIN. #10 EQUIPMENT GROUND & GROUND DISCONNECT 3. FLEX TO BE SECURED WITHIN 12" OF ENCLOSURES 4. SECURE "CU1" UNIT TO STRUCTURE 5. AC1 DISCONNECT NEEDS PROPER FRONT WORKING CLEARANCE 6. AC 3 DISCONNECT NEEDS PROPER FRONT WORKING CLEARANCE 7. TIGHTEN ALL DISCONNECT BOND SCREWS |