Inspection History Details
Inspection Status: Approved
Inspection History: ELECTRIC - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/12/2008 | ELECTRIC - FINAL | Approved | IVRS - Inspection :* | |
| 07/31/2008 | ELECTRIC - FINAL | Partial Approval | IVRS - Inspection :* 1) CALL FOR FINAL INSP AFTER POWER CHECK 2) NO BOND REQUIRED |
|
| 07/30/2008 | ELECTRIC - FINAL | Denied | IVRS - Inspection : There is no access to the site.| 920* BLD. LOCKED SERVICE EQUIP. LOCKED CALLED AHEAD PER REQUEST, LEFT MESSAGE |
|
| 07/29/2008 | ELECTRIC - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999* BOND JUMPERS PER 250.66 IN SERVICE 2/0 |
|
| 07/28/2008 | ELECTRIC - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999* SERVICE INSPECTION ONLY 1. COMPLETE ITEMS #1, #2, #7 FROM PREVIOUS INSPECTION SITE JUMPERS PER NEC 250.102, 250.104, 250.28, 250.66 BOND GAS PIPING ALSO, SEE PLAN FOR SIZING OF JUMPERS. 2. BOND GROUND TO PANEL ENCLOSURE B PANEL B 3. RECALL WHEN READY |
|
| 07/23/2008 | ELECTRIC - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1. INSTALL BOND BUSHING ON NIPPLE AHEAD OF OVERCURRENT PROTECTION, TIGHTEN LOCKNUTS 2. INSTALL MAIN BOND JUMPER IN SERVICE DISC. SWITCH 3. I.D PHASE CONDUCTORS 4. INSTALL FUSES AND REJECTION PINS, PANEL "A" REQUIRES MAIN BRKR PER PLAN 5. SEPARATE GROUNDS & NEUTRALS IN PANEL "A" 6. INSTALL BOND BUSHING WHERE USING RE WASHER 7. BOND BLD, WATER 8. BLD. ENERGIZED PRIOR TO INSPECTORS APPROVAL WITH TEMP FROM NEXT DOOR PEDESTAL |
|
| 07/16/2008 | ELECTRIC - FINAL | Partial Approval | IVRS - Inspection :* WAIVER REQUIRED FOR OVERHEAD SERVICE |
|
| 07/16/2008 | ELECTRIC - FINAL | Partial Approval | WAIVER OK FOR OVERHEAD SERVICE |