Inspection History Details
Inspection Status: Approved
Inspection History: ENGINEERING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/28/2010 | ENGINEERING - FINAL | Approved | Approved | |
| 04/30/2007 | ENGINEERING - FINAL | Denied | SITE PLAN MUST BE REVIEWED BY ZONING FOR STORAGE CONTAINERS SOUTH OF BUILDING (SEE PICS UNDER SIRE-IMAGES) FULL CODE COMPLIANCE IS REQUIRED FOR 25% EXPANSION |
|
| 04/30/2007 | ENGINEERING - FINAL | Denied | DELIVERED PPW ADDED PICTURES OF STORE FRONT |
|
| 04/27/2007 | ENGINEERING - FINAL | Correction Required | CALLED AND LEFT MESSAGE FOR PAUL MACHADO PICS OF STORAGE BOXES -CLEAN UP CONCRETE DEBRIS FROM REAR OF BUILDING -CLEAN UP DRYWALL AND PAINT WASHOUT AT SPIGOTS AT BOTH FRONT AND REAR OF BUILDING -STORAGE CONTAINERS NOT SHOWN ON PLANS -H/C RAMPS DO NOT MEET CURRENT ADA GUIDELINES (FULL CODE COMPLIANCE?) -ASPHALT ON EAST SIDE OF BUILDING AT DRIVEWAY DAMAGED PAUL 1/8/07 APPROVED "FOR DEMO" |