Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit: T07CM00093

Parcel: 13322471B

Inspection Status: Approved

Inspection History: PLUMBING - GAS PRESSURE TEST

Date Description Inspector Results Comments
05/14/2007 PLUMBING - GAS PRESSURE TEST Approved IVRS - Inspection :*
04/12/2007 PLUMBING - GAS PRESSURE TEST Partial Approval IVRS - Inspection :*
1. OK TO COVER PIPING IN WALLS
2. NEED TO HAVE PIPING DRAWING FOR ENTIRE SYSTEM OF BUILDING.
3. REQUIRE PSI TESTING OF ENTIRE PIPING SYSTEM BECAUSE METER IS OFF.
4. ONE GAS METER SUPPLIES ENTIRE SHELL BUILDING
5. HAVE NEW FAVS INSPECTED
04/11/2007 PLUMBING - GAS PRESSURE TEST Not ready for Inspection IVRS - Inspection :*
GAUGE
ROOF ACCESS
REDLINE DRAWING TO REPRESENT INSTALLATION
3052 IS FOR AFTER CONCEALMENT INSP.