Inspection History Details
Inspection Status: Approved
Inspection History: FRAMING
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/16/2007 | FRAMING | Approved | IVRS - Inspection :* | |
| 04/12/2007 | FRAMING | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1) 1" CLEARANCE TO WATER FLUE AT 2ND FLOOR CEILING |
|
| 04/11/2007 | FRAMING | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1) 1" TO H20 FLUE AT ROOF 2) FHA PASS THROUGH ABS 3) FIREBLOCK PASS THROUGH 4) FINISH MESH AT TOP |