Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Approved
Inspection History: ENGINEERING - FINAL
Permit Number - T07CM00016
Inspection Description - ENGINEERING - FINAL
Inspection Status - Approved
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 03/24/2009 | ENGINEERING - FINAL | Approved | RELAYING CALLS BETWEEN DAVID RIVERA AND TJ CAMERON REGARDING BIKE LOCKER LOCATION MOVE | |
| 03/16/2009 | ENGINEERING - FINAL | Not ready for Inspection | PRELIMINARY PUNCH LIST -INSTALL BIKE LOCKERS -ADD HAND RAIL 2 LOCATIONS WHERE RAMP SLOPE >8.33% -RECALL FOR H/C PARKING NO SLOPE >2% IN ANY DIRECTION -STRIPE WALKWAYS PER PLAN AND STRIPE LOADING ZONE -PROVIDE LETTER (STAMPED BY EOR) FOR DRAINAGE FACILITIES BUILT PER PLAN -COMPLETE PAVER WORK AT RAMP LOCATIONS GROUTING AND SANDING -COMPLETE SITE WORK, LANDSCAPING AND CLEAN UP |
|
| 06/20/2008 | ENGINEERING - FINAL | Not ready for Inspection | AS OF 12:00 TODAY -PAVERS NOT COMPLETE AT N SIDE OF SHOWROOM/OFFICES -DRIVEWAY NOT YET CURED -STRIPING NOT COMPLETE -FENCING NOT IN PLACE TO SEPARATE CONSTRUCTION FROM PUBLIC ACCESS -TRACK OUT ONTO 22ND ST ??-COBBLESTONE PAVERS ADA COMPLIANT ??-70% CONTRAST ON TRUNCATED DOMES |