Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - GAS PRESSURE TEST
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 12/11/2008 | PLUMBING - GAS PRESSURE TEST | Approved | IVRS - Inspection :* | |
| 05/09/2008 | PLUMBING - GAS PRESSURE TEST | Partial Approval | IVRS - Inspection :* FROM METER THRU SYSTEM TO ALL APPLIANCE VALVE LOCATIONS EXCEPT CAPPED THRU WEST WALL FOR STEAM CLEANER, AND CAPPED AT EC/HEATER FOR TEST GAUGE. TEST OK 1. PROVIDE ADDITION SUPPORTS AS REQUIRED ESPECIALLY AT SWING JOINTS, RETEST CONTINUATION OF PIPING ON STEAM CLEANER (10 PSI) HAVE REINSPECTION PRIOR TO CEILING TILES THIS INSPECTION FROM REVISED PLAN DATED 3/21/08 WB TO BE CITY APPROVED PRIOR TO FINAL. |