Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit: T07CM00016

Parcel: 135084520


Addresses:

7150 E 22ND ST


Inspection Status: Approved

Inspection History: PLUMBING - ROUGH, SOIL

Permit Number - T07CM00016

Inspection Description - PLUMBING - ROUGH, SOIL

Inspection Status - Approved

Date Description Inspector Results Comments
12/11/2008 PLUMBING - ROUGH, SOIL Approved IVRS - Inspection :*
11/20/2008 PLUMBING - ROUGH, SOIL Partial Approval IVRS - Inspection :*
WATER TEST TO 4" FD-1 BOX OUT FOR CARWASH TRENCH DRAIN
11/19/2008 PLUMBING - ROUGH, SOIL Partial Approval IVRS - Inspection :*
INSTALL OF SAND/OIL INTERCEPTOR VENT TO 10' AFF WATER TEST, INSTALL OF 4" FD-1 WITH VENT TO 10' AFF INITIALED ON P2.1C WATER TEST
11/18/2008 PLUMBING - ROUGH, SOIL Partial Approval IVRS - Inspection :*
WATER TEST FOR STUB UP FOR TRENCH DRAIN & INSTALL
OF (2) 4" FD-1's FOR CARWASH
11/14/2008 PLUMBING - ROUGH, SOIL Not ready for Inspection IVRS - Inspection :*
11/13/2008 PLUMBING - ROUGH, SOIL Not ready for Inspection IVRS - Inspection :*
10/23/2008 PLUMBING - ROUGH, SOIL Partial Approval IVRS - Inspection :*
3" REDLINE ON PAGE P2.1C AT OWNER REQUEST UNDERGROUND WATER TEST OK PENDING REVISED CITY APPROVED PLAN OF THIS
10/16/2008 PLUMBING - ROUGH, SOIL Partial Approval IVRS - Inspection :*
1. 2" STUB UP & OUT AT EQUIPMENT 310 FOR WATER SERVICE TEST OK
2. 10" DDL PER INITIAL WATER TEST UNDERGROUND ONLY OK
3. 8" DDL PER REDLINE & INITIAL WATER TEST UNDERGROUND ONLY OK
10/14/2008 PLUMBING - ROUGH, SOIL Not ready for Inspection IVRS - Inspection :*
10/08/2008 PLUMBING - ROUGH, SOIL Partial Approval IVRS - Inspection :*
6" DDL PER INITIAL WATER TEST P2.1C OK
CONTINUATION OF FD-1 PER INITIAL P2.1C WATER TEST OK
09/29/2008 PLUMBING - ROUGH, SOIL Partial Approval IVRS - Inspection :*
THIS INSPECTION FOR ELEVATOR SUMP PUMP & DISCHARGE PIPING TO FLOOR SINK PER PLAN AIR TEST OK
09/25/2008 PLUMBING - ROUGH, SOIL Partial Approval IVRS - Inspection :*
4" SAND/OIL INTERCEPTOR DRAINAGE PIPING FROM INITIAL P2.1C THRU PER INITIAL P2.1d
09/23/2008 PLUMBING - ROUGH, SOIL Partial Approval IVRS - Inspection :*
2" DRAINAGE WITH TEST TO 10' FOR EQUIPMENT 310 FOR WASHER AND FLOOR SINK OK
09/22/2008 PLUMBING - ROUGH, SOIL Partial Approval IVRS - Inspection :*
4" RDL AT STAIR #3 UNDERGROUND WATER TEST OK PER INITIAL P2.1d
09/19/2008 PLUMBING - ROUGH, SOIL Partial Approval IVRS - Inspection :*
MENS RESTROOM 303, WOMENS 304, JANITOR 305,
LOUNGE 302, UNDERGROUND OK
02/28/2008 PLUMBING - ROUGH, SOIL Partial Approval IVRS - Inspection :*
INSTALLATION OF GREASE TRAP & EXTRA FLOOR SINK TO SANITARY PER REDLINES PAGE P2.1A WATER TEST OK
THIS WILL REQUIRE REVISED CITY APPROVED PLAN AT
LATER DATE
PRE-SLAB LINE 6 AND H NORTH & WEST
02/27/2008 PLUMBING - ROUGH, SOIL Not ready for Inspection IVRS - Inspection :*
4" FROM SOUTHEAST EXTERIOR SANITARY STUB OUT OF BUILDING TO 6" SANITARY PER REDLINE ON SITE WATER TEST OK -- NEED TO SEE TIE IN AT FUTURE AFTER SITE SEWER AUTHORIZATION TO DISCHARGE
01/28/2008 PLUMBING - ROUGH, SOIL Partial Approval IVRS - Inspection :*
ADDITION OF 2" DIRECT DRAIN CONNECTION FOR 3-COMP SINK AT REDLINED CAFE 131 --- WATER TEST OK
01/25/2008 PLUMBING - ROUGH, SOIL Partial Approval IVRS - Inspection :*
UNDERGROUND FROM EXISTING 4" BUILDING DRAIN FOR REDLINED ADDITION OF CAFE 131 (2) HAND SINKS,
(2) FLOOR SINKS, (1) 3-COMP SINK WATER TEST PARTIAL PENDING APPROVED DIRECT DRAIN CONNECTION FOR RAIN DRAIN COLUMN LINE B, C, D OK
12/28/2007 PLUMBING - ROUGH, SOIL Partial Approval IVRS - Inspection :*
(4) 8" RAIN DRAINS TESTED FROM 2" BLD. EXTERIOR TO
10' AFF COLUMN LINE 10 OK
12/27/2007 PLUMBING - ROUGH, SOIL Partial Approval IVRS - Inspection :*
1) WATER TEST 4" INTERCEPTOR DRAINAGE FOR SECURE #160 THRU TO 5' BLDG EXTERIOR INCLUDING VENTS
2) WATER TEST 6" SANITARY FOR (2) ? AND FILLER SINK SECURE 110 INCLUDING VENTS TO B' BLDG EXTERIOR
12/06/2007 PLUMBING - ROUGH, SOIL Partial Approval IVRS - Inspection :*
2 COPPER FROM ELEVATOR PIT TO 2' WEST OF PHASE 1 STRUCTURE (UNDERGROUND)
WATER TEST 2" DRAIN FOR REDLINED SINK AT CAFE 131 OK PENDING REVISED CITY APPROVED PLAN.

4" BUILDING DRAIN FROM EAST EXTERIOR FOR 4" FD-1 & 2" FD WITH VENT TEST TO 8' VENT PIPING CONTINUOUS, TO BE TESTED AT LATER DATE.
12/04/2007 PLUMBING - ROUGH, SOIL Partial Approval IVRS - Inspection :*
OPF REPAIR OK
11/28/2007 PLUMBING - ROUGH, SOIL Partial Approval IVRS - Inspection :*
WATER TEST UNDERGROUND AT SHOWROOM AREA PAGE P2.18 EXCEPT EDF-1 AT RESTROOM 134
11/09/2007 PLUMBING - ROUGH, SOIL Partial Approval IVRS - Inspection :*
PIPING IN MASONRY WALL ALONG COL. 8 W/TEST TO 10' OK
09/24/2007 PLUMBING - ROUGH, SOIL Partial Approval IVRS - Inspection :*
THIS INSPECTION IS FOR TEMPORARY CAPPING OF GAS, WATER, SEWER FOR DEMO OF SITE FOR NEW BUILDING 2