Inspection Status: Approved
Inspection History: REINFORCED MASONRY PRE-GROUT
Permit Number - T07CM00016
Inspection Description - REINFORCED MASONRY PRE-GROUT
Inspection Status - Approved
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 03/25/2009 | REINFORCED MASONRY PRE-GROUT | Approved | IVRS - Inspection :* | |
| 11/25/2008 | REINFORCED MASONRY PRE-GROUT | Partial Approval | IVRS - Inspection :* CMU SITE WALL ON SIDE WEST END @ KOLB CORNER 25' FROM 2'0" TO 10'0" W/CLEANOUTS |
|
| 10/24/2008 | REINFORCED MASONRY PRE-GROUT | Partial Approval | IVRS - Inspection :* CMU WALLS @ STAIRWELL #4 FROM 40'0" TO 46'0" OK |
|
| 10/23/2008 | REINFORCED MASONRY PRE-GROUT | Partial Approval | IVRS - Inspection :* CMU WALLS @ STAIRWELL #4 FROM 36'0" TO 40'0" |
|
| 10/21/2008 | REINFORCED MASONRY PRE-GROUT | Partial Approval | IVRS - Inspection :* CMU WALL REINFORCEMENT STEEL @ STAIRWELL #4 FROM 28'0" TO 36'0" W/CLEANOUTS & CARWASH EAST WALL FROM 12'0" TO 16'0" TOP OUT |
|
| 10/15/2008 | REINFORCED MASONRY PRE-GROUT | Partial Approval | IVRS - Inspection :* CMU WALLS @ STAIRWELL #4 FROM 20'0" TO 28'0" |
|
| 10/14/2008 | REINFORCED MASONRY PRE-GROUT | Partial Approval | IVRS - Inspection :* SPECIAL INSPECTION COMPLETE EQUIPMENT ROOM #310 FROM 8'0" TO TOP OUT AND STAIRWELL #4 FROM 16'0" TO 20'0" -- OK TO GROUT |
|
| 10/08/2008 | REINFORCED MASONRY PRE-GROUT | Not ready for Inspection | IVRS - Inspection :* | |
| 10/07/2008 | REINFORCED MASONRY PRE-GROUT | Partial Approval | IVRS - Inspection :* CMU WALLS @ STAIRWELL #3 -- 40'0" TO 46'0" (TOPOUT) CARWASH 12'0" TO 16'0" (TOPOUT) & STAIRWELL #4 - 12'0" TO 16'0" OK TO GROUT |
|
| 10/06/2008 | REINFORCED MASONRY PRE-GROUT | Partial Approval | IVRS - Inspection :* COMPLETED ERACTION OF PRE-CAST CONCRETE AT NEW PARKING GARAGE |
|
| 10/03/2008 | REINFORCED MASONRY PRE-GROUT | Partial Approval | IVRS - Inspection :* CMU WALL @ STAIRWELL #4 FROM 8'0" TO 12'0" AFFE |
|
| 10/02/2008 | REINFORCED MASONRY PRE-GROUT | Partial Approval | IVRS - Inspection :* CMU WALLS @ STAIRWELL #3 FROM 28'0" TO 36'0" AND CMU WALLS @ CAR WASH FROM 8'0" TO 12'0" -- OK TO GROUT |
|
| 10/01/2008 | REINFORCED MASONRY PRE-GROUT | Partial Approval | IVRS - Inspection :* CAR WASH CMU WALLS 2ND LIFT FROM 4' TO 8'0" AND STAIRWELL #4 CMU WALLS 2ND LIFT FROM 4' TO 8'0" OK TO GROUT |
|
| 09/30/2008 | REINFORCED MASONRY PRE-GROUT | Partial Approval | IVRS - Inspection :* CMU WALLS @ EQUIPMENT RM #310 1ST LIFT FROM 0' TO 4' AFFE -- OK TO GROUT |
|
| 09/29/2008 | REINFORCED MASONRY PRE-GROUT | Partial Approval | IVRS - Inspection :* 1. 1ST FLOOR USED CAR SALES ENTRY ALCOVE FROM 8' TO 12' TOP OUT 2. STAIR #3 FROM 20' TO 28' -- OK TO GROUT |
|
| 09/26/2008 | REINFORCED MASONRY PRE-GROUT | Partial Approval | IVRS - Inspection :* CMU WALLS @ GRID LINES G3/GA TO GB AND G3/GB TO GC TOP OUT 14'0" AFFE |
|
| 09/25/2008 | REINFORCED MASONRY PRE-GROUT | Partial Approval | IVRS - Inspection :* 1. CMU WALLS @ STAIR #3 FROM 12' TO 20' AND STAIR #4 AND CAR WASH 0' TO 4' AFFE |
|
| 09/24/2008 | REINFORCED MASONRY PRE-GROUT | Partial Approval | IVRS - Inspection :* CMU WALLS AT 1ST FLOOR USED CAR SALES ENTRY ALCOVE FROM 4' TO 8' AFFE |
|
| 09/23/2008 | REINFORCED MASONRY PRE-GROUT | Partial Approval | IVRS - Inspection :* PRE-CAST COLUMNS @ WEST SECTIONS #4 & #5 W/END PANELS |
|
| 09/19/2008 | REINFORCED MASONRY PRE-GROUT | Partial Approval | IVRS - Inspection :* CMU WALLS AROUND STAIR #3, CMU WALLS @ GRID LINES G.4/GA TO GC & GA/G3 TO G4 AND USED CAR SALES FLOOR ENTRY ALCOVE @ SOUTH/EAST CORNER @ G4/CC FROM TOP OF STEM TO 4' AFF |
|
| 08/22/2008 | REINFORCED MASONRY PRE-GROUT | Partial Approval | IVRS - Inspection :* SOUTH SITE WALL CMU - 144'0" L.F EAST TO WEST TOP OUT @ 10' ABOVE TOF AND 48'0" L.F AT WEST END FROM 4'0" TO 8'0" 2ND LIFT ABOVE TOF |
|
| 08/21/2008 | REINFORCED MASONRY PRE-GROUT | Partial Approval | IVRS - Inspection :* 2ND LIFT @ LAST 48 L.F OF SOUTH SITE WALL WEST END OK TO GROUT |
|
| 08/18/2008 | REINFORCED MASONRY PRE-GROUT | Partial Approval | IVRS - Inspection :* 2ND LIFT TO 8FT @ WEST END 160 L.F OF SOUTH SITE WALL |
|
| 06/24/2008 | REINFORCED MASONRY PRE-GROUT | Partial Approval | IVRS - Inspection :* TOP OUT OF CMU WALLS @ TRASH ENCLOSURE ON EAST SIDE AND CMU WALL ABOVE SPILLWAY @ RETENTION BASIN |
|
| 06/06/2008 | REINFORCED MASONRY PRE-GROUT | Partial Approval | IVRS - Inspection :* 1ST LIFT @ BASIN AREA CMU SITE WALL FROM TOP TO 3'4" |
|
| 06/05/2008 | REINFORCED MASONRY PRE-GROUT | Partial Approval | IVRS - Inspection :* 128 L.F CMU SITE WALL FROM EAST BASIN SOUTH TOP OUT @ 11'4" |
|
| 06/03/2008 | REINFORCED MASONRY PRE-GROUT | Partial Approval | IVRS - Inspection :* FROM RETENTION BASIN ON EAST SIDE SOUTH, FIRST 128 L.F 2ND LIFT TO 7'4" AND NEXT 100 L.F TO TOP OUT @ 11'4" OK TO GROUT |
|
| 05/29/2008 | REINFORCED MASONRY PRE-GROUT | Partial Approval | IVRS - Inspection :* TOP OUT OF CMU PERIMETER SITE WALL @ 11'4" ABOVE FOOTING 32 L.F FROM S/E CORNER NORTH AND WEST AND 105 L.F AT FAR WEST END. |
|
| 05/28/2008 | REINFORCED MASONRY PRE-GROUT | Partial Approval | IVRS - Inspection :* PRE-GROUT @ S/E CORNER 32' LF RETAINING WALL 2ND LIFT TO 7'4" - 160 L.F OF EAST WALL TO 3'4" AND 105 LF OF SOUTH WALL 2ND LIFT TO 7'4" |
|
| 05/23/2008 | REINFORCED MASONRY PRE-GROUT | Partial Approval | 80 L.F OF EAST SIDE WALL FROM S/E CORNER GOING NORTH FROM TOP OF FOOTING TO 40 INCHES NOTE: ABOVE CALLED IN AS APPROVED IN ERROR |
|
| 05/21/2008 | REINFORCED MASONRY PRE-GROUT | Partial Approval | IVRS - Inspection :* 105 L.F FROM MIDPOINT WEST FROM TOP OF FOOTING TO 3 FOOT 4 INCH |
|
| 05/20/2008 | REINFORCED MASONRY PRE-GROUT | Partial Approval | IVRS - Inspection :* 1. 30 L.F EACH WAY @ S.E CORNER FROM TOP OF FOOTING TO 3FT 4 INCH 2. TOP OUT @ 11FT 4" OF 205 L.F OF CMU WALL FROM S/E CORNER WEST |
|
| 05/16/2008 | REINFORCED MASONRY PRE-GROUT | Partial Approval | IVRS - Inspection :* 205 L.F FROM S/E CORNER WEST FROM 3 FT 4 INCH TO 7FT 4 INCH OK TO GROUT |
|
| 05/14/2008 | REINFORCED MASONRY PRE-GROUT | Partial Approval | IVRS - Inspection :* 205 L.F OF CMU RETAINING FROM EAST PROPERTY CORNER/WEST FROM 0' TO 4 FOOT -- 1ST LIFT |
|
| 03/10/2008 | REINFORCED MASONRY PRE-GROUT | Partial Approval | IVRS - Inspection :* CMU REINFORCEMENT STEEL @ GRID LINES 5/F.5 TO I.5 TOP OUT AND LINE 6/K TO L 0' TO 8' & 4/K TO K.5 W/EPOXY DOWELS VIEWED BY ENGINEER |
|
| 03/07/2008 | REINFORCED MASONRY PRE-GROUT | Not ready for Inspection | IVRS - Inspection :* | |
| 01/25/2008 | REINFORCED MASONRY PRE-GROUT | Partial Approval | IVRS - Inspection :* CMU REINFORCEMENT STEEL @ GRID LINES L/8.3 TO 8.5 FROM 20' TO 26' AFF -- OK TO GROUT AND AREA B DOOR INFILL OK |
|
| 01/23/2008 | REINFORCED MASONRY PRE-GROUT | Partial Approval | IVRS - Inspection :* CMU REINFORCEMENT STEEL @ GRID LINES L/6 THRU 8 & 8/K THRU L FROM 24' TO 28' TOP OUT |
|
| 01/22/2008 | REINFORCED MASONRY PRE-GROUT | Partial Approval | IVRS - Inspection :* CMU REINFORCEMENT STEEL @ GRID LINES L/8 TO 8.5 L/8.75 TO 10 FROM 24' TO 26' TOP OUT AND L/6 TO 8.5 FROM 20' TO 24' |
|
| 01/18/2008 | REINFORCED MASONRY PRE-GROUT | Partial Approval | IVRS - Inspection :* CMU REINFORCEMENT STEEL @ GRID LINES 10/A TO E.3 24' TO TOP OUT - 10/E.3 TO L 20' TO 24' AFF AND 8/K TO L 18' TO 22' AFF -- OK TO GROUT |
|
| 01/17/2008 | REINFORCED MASONRY PRE-GROUT | Partial Approval | IVRS - Inspection :* CMU REINFORCEMENT STEEL @ GRID LINES A/8 TO 10 - 10/A TO E.3-L/8.5 TO 10 FROM 20' TO 24' AFF |
|
| 01/16/2008 | REINFORCED MASONRY PRE-GROUT | Partial Approval | IVRS - Inspection :* CMU REINFORCEMENT STEEL @ GRID LINES 10/FROM A TO L AND L FROM 6 TO 8 @ 16' TO 20' -- OK TO GROUT |
|
| 01/15/2008 | REINFORCED MASONRY PRE-GROUT | Partial Approval | IVRS - Inspection :* CMU REINFORCEMENT STEEL @ GRID LINES GD/8 TO 9 AND L/8.5 TO 10 FROM 16' TO 20' AFF |
|
| 01/11/2008 | REINFORCED MASONRY PRE-GROUT | Partial Approval | IVRS - Inspection :* - CMU REINFORCEMENT STEEL @ GRID A/8 TO 10 FROM 16' TO 20' 10/A TO L FROM 12' TO 16' AND 8/J TO K FROM 20' TO 24' |
|
| 01/10/2008 | REINFORCED MASONRY PRE-GROUT | Not ready for Inspection | IVRS - Inspection :* CONTRACTOR CANCELLED |
|
| 01/09/2008 | REINFORCED MASONRY PRE-GROUT | Partial Approval | IVRS - Inspection :* CMU REINFORCEMENT STEEL @ GRID L/6 TO 8.5 & A/B TO 10 FROM 12' TO 16' AFFE |
|
| 01/08/2008 | REINFORCED MASONRY PRE-GROUT | Partial Approval | IVRS - Inspection :* CMU REINFORCEMENT STEEL @ GRID A/8 TO 10 AND L/6 TO 8.5 FROM 8' TO 12' AND L/8.5 TO 10 FROM 12' TO 16' --- OK TO GROUT |
|
| 01/03/2008 | REINFORCED MASONRY PRE-GROUT | Partial Approval | IVRS - Inspection :* CMU REINFORCEMENT STEEL @ GRID A/8 TO 8.5 & A/8.5 TO 10 FROM 4' TO 8' L/8.5 TO 10 FROM 12' TO 16' AND 10/A TO L FROM 8' TO 12' NOTE: @ GRID LINE 10 LT7 LINTELS ARE MISSING DOUBLE WELDED REBARS AT ENDS PER DETAIL S7.1/211 MUST BE ADDED BEFORE CONTINUING VERTICAL PLACEMENT OF CMU ABOVE LINTELS |
|
| 01/02/2008 | REINFORCED MASONRY PRE-GROUT | Partial Approval | IVRS - Inspection :* CMU REINFORCEMENT STEEL @ GRID 8/A TO L TOP OUT AND L/8.5 TO 10 FROM 8' TO 12' |
|
| 12/27/2007 | REINFORCED MASONRY PRE-GROUT | Partial Approval | IVRS - Inspection :* 1) CMU REINFORCEMENT STEEL AT GRID 8/A TO K FROM 25'-4" TO 29'-4" AND 10/A TO L FROM 4' TO 8' |
|
| 12/26/2007 | REINFORCED MASONRY PRE-GROUT | Partial Approval | IVRS - Inspection :* 1) CMU REINFORCEMENT STEEL AT GRID A/8 TO 10 FROM 0' TO 4' AND L/8,5 TO 10 FROM 4' TO 8' |
|
| 12/21/2007 | REINFORCED MASONRY PRE-GROUT | Not ready for Inspection | IVRS - Inspection :* 1) RAINED OUT |
|
| 12/20/2007 | REINFORCED MASONRY PRE-GROUT | Partial Approval | IVRS - Inspection :* CMU REINFORCEMENT STEEL @ GRID 4/K TO L & L/4 TO 6 FROM 24' TO 28' (TOP OUT) AND 9/A TO L 0' TO 4' (TOP OUT) AND GD/8' TO 10' STEM WALL |
|
| 12/18/2007 | REINFORCED MASONRY PRE-GROUT | Partial Approval | IVRS - Inspection :* CMU REINFORCEMENT STEEL @ ELEVATOR SHAFT FROM 24'8" TO 28' TOP OUT - STEM WALL @ GD/8 TO 10 STILL WET NO INSPECTION UNTIL IT DRIES OUT |
|
| 12/17/2007 | REINFORCED MASONRY PRE-GROUT | Partial Approval | IVRS - Inspection :*CMU REINFORCEMENT STEEL @ GRID L/4 TO 6 & 4/K TO L FROM 20' TO 24' - GRID 8/A.5 TO K FROM 12'4" TO 25'6" AND ELEVATOR SHAFT FROM 22' TO 24'8" | |
| 12/13/2007 | REINFORCED MASONRY PRE-GROUT | Partial Approval | IVRS - Inspection :* SPECIAL INSPECTION #28 GRID LINE - L 4 TO 6 16'-20' G.LINE 4-K-L 18'-20' G.LINE GD-8-10 FLOODED |
|
| 12/12/2007 | REINFORCED MASONRY PRE-GROUT | Partial Approval | IVRS - Inspection :* CMU REINFORCEMENT STEEL @ GRID LINES L/4 TO 6 FROM 12' TO 16' A/K TO L FROM 12' TO 18' - 6/K TO L, K/6 TO 6.5, 6.5/K TO L, 7.5/K TO L AND K/7.5 TO 8 FROM 20' TO 24' |
|
| 12/10/2007 | REINFORCED MASONRY PRE-GROUT | Not ready for Inspection | IVRS - Inspection :* RAINED OUT |
|
| 12/07/2007 | REINFORCED MASONRY PRE-GROUT | Partial Approval | IVRS - Inspection :* CMU REINFORCEMENT STEEL @ GRID 6/D.5 TO E - 5/F.5 TO H.5 - I/5 TO 5.5 FROM 24' TO 26' 6/K TO L - 6.5/K TO L - K/6 TO 6.5 - K/7.5 TO 8 & 7.5/K TO L FROM 16' TO 20' AND ELEVATOR SHAFT FROM 12' TO 16' |
|
| 12/06/2007 | REINFORCED MASONRY PRE-GROUT | Partial Approval | IVRS - Inspection :* CMU REINFORCEMENT STEEL @ GRID LINE A.5/6.5 TO 8 & ELEVATOR SHAFT FROM 8' TO 12' 6/D.5 TO E -- 5/F.5 TO H.5 & I/5 TO 5.5 FROM 20' TO 24' AND L/6 TO 8 FROM 4' TO 8' AND 7.5/A.5 TO B.5 FROM 20' TO 24' |
|
| 12/05/2007 | REINFORCED MASONRY PRE-GROUT | Partial Approval | IVRS - Inspection :* CMU REINFORCEMENT STEEL @ GRID A.5/6.5 TO 8 AND ELEVATOR SHAFT FROM 8' TO 12' AFF |
|
| 12/04/2007 | REINFORCED MASONRY PRE-GROUT | Partial Approval | IVRS - Inspection :* CMU REINFORCEMENT STEEL @ GRID LINES 7.5/K TO L AND K/7.5 TO 8 FROM 12' TO 16' |
|
| 12/03/2007 | REINFORCED MASONRY PRE-GROUT | Partial Approval | IVRS - Inspection :* CMU REINFORCEMENT STEEL @ GRID 6/D.5 TO E - 5/F.5 TO H.5 - I/5 TO 5.5 7.5/A.5 TO B.5 FROM 16' - 20' B.5/F.5 TO 6 FROM 20' TO 24' 4/K TO L & L/4 TO 6 FROM 8' TO 12' L/8.5 TO 10 FROM 0' TO 4' AND ELEVATOR SHAFT FROM 4' TO 8' |
|
| 11/30/2007 | REINFORCED MASONRY PRE-GROUT | Partial Approval | IVRS - Inspection :* GRID LINES L/8.5 TO 10 - 0' TO 4' - 8/A.5 TO K 12' TO 16' ELEVATOR 4' TO 8' & B.5/5.5 TO 6 16' TO 20' -- OK TO GROUT |
|
| 11/28/2007 | REINFORCED MASONRY PRE-GROUT | Partial Approval | IVRS - Inspection :* CMU REINFORCEMENT STEEL @ GRID LINES 6/K TO L 6.5/K TO L & K/6 TO 6.5 FROM 12' TO 16' - 7.5/K TO L AND K/7.5 TO 8 FROM 8' TO 12' AND 10/A TO L FROM 0' TO 4' |
|
| 11/27/2007 | REINFORCED MASONRY PRE-GROUT | Partial Approval | IVRS - Inspection :* 1) CMU REINFORCE STEEL AT GRID LINES-4/K TO L-L/A TO 6-7.5/K TO L-A.5/6.5 TO 8-7.5/K TO L FROM 4' TO 8'-I/5 TO 5.5-5/F.5 TO H.5-E/D.5 TO E-B.5/5.5 TO 6-7.5/A.5 TO B.5 FROM 12' TO 16'-6/K TO L-6.5/K TO L-K/6 TO 6.5 AND 8 A.5 TO K FROM 8' TO 12' AND D.5/6 TO 6.5 TOP OUT AT 13'-7" |
|
| 11/26/2007 | REINFORCED MASONRY PRE-GROUT | Partial Approval | IVRS - Inspection :* CMU MASONRY REINFORCEMENT STEEL @ GRID LINES D.5/7 TO 8 TOP OUT @ 13 FOOT 7 INCH AND ELEVATOR SHAFT FROM F.F.E TO 4 FOOT (1ST LIFT) |
|
| 11/21/2007 | REINFORCED MASONRY PRE-GROUT | Partial Approval | IVRS - Inspection :* CMU REINFORCEMENT STEEL @ GRID LINES - 8/A.5 TO L 7.5/A.5 TO B.5 - B.5/5.5 TO 6.5 6/D.5 TO E - E/6 TO 6.5 - 5/F.5 TO H.5 - I/5 TO 5.5 6/K TO L - 6.5/K TO L & K/6 TO 6.5 FROM 8 FOOT TO 12 FOOT |
|
| 11/20/2007 | REINFORCED MASONRY PRE-GROUT | Partial Approval | IVRS - Inspection :* PER SP. INSP. |
|
| 11/19/2007 | REINFORCED MASONRY PRE-GROUT | Partial Approval | IVRS - Inspection :* CMU REINFORCEMENT STEEL @ GRID LINE 6/K TO L 6.5/K TO L & K/6 TO 6.5 -- OK TO GROUT |
|
| 11/16/2007 | REINFORCED MASONRY PRE-GROUT | Partial Approval | IVRS - Inspection :* CMU REINFORCEMENT STEEL @ GRID LINES I/5 TO 5.5 5/F.5 TO H.5 - 6/D TO E - E/6 TO 6.5 - B.5/5.5 TO 6.5 D.5/7 TO 8 7.5/A.5 TO B.5 2ND LIFT 4' TO 8' -- OK TO GROUT |
|
| 11/15/2007 | REINFORCED MASONRY PRE-GROUT | Partial Approval | IVRS - Inspection :* CMU WALL REINFORCING STEEL @ GRID L/4 TO 6 - 4/L TO K I/5 TO 5.5 - 5/F.5 TO H.5 - 6/D TO E - E/6 TO 6.5 D.5/7 TO 8 - 7.5/A.5 TO B.5 - 6/K TO L - 6.5/K TO L K/6 TO 6.5 1ST LIFT TO 4 FEET AFFE OK TO GROUT |
|
| 11/13/2007 | REINFORCED MASONRY PRE-GROUT | Partial Approval | IVRS - Inspection :* 1) CMU REINFORCING STEEL AT GRID LINE 8/A.5 TO J 2ND LIFT FROM 4 FOOT TO 8 FOOT |
|
| 11/09/2007 | REINFORCED MASONRY PRE-GROUT | Partial Approval | IVRS - Inspection :* CMU STEEL REINFORCEMENT @ GRID 8/A.5 TO K.5 |