Inspection History Details
Inspection Status: Approved
Inspection History: ENGINEERING - FINAL
Permit Number - T07CM00014
Inspection Description - ENGINEERING - FINAL
Inspection Status - Approved
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
10/07/2008 | ENGINEERING - FINAL | Approved | Approved per 10/07 meeting with Barclay | |
09/25/2008 | ENGINEERING - FINAL | Partial Approval | OK for temp C of O. Contractor needs to: 1- Keep all construction activity and debris separated for public activity. 2- Clean wash out rear of building. 3- Install bike parking. (all) Spoke to Mike. |
|
09/03/2008 | ENGINEERING - FINAL | Partial Approval | Contractor needs to: 1- Remove all mobile minis from site or obtain permits. 2- Remove trash dumpster from site. 3- Provide approved detail for drainage rear of building. 4- Barclay needs to provide approved asbuilt for final inspection. 5- Remove all construction debris from rear of building. 6- Remove all port-a-pottys from site. 7- Remove construction trailer from site. 8- Provide approved copy of DSMR for trash enclosure. |