Inspection History Details
Inspection Status: Approved
Inspection History: STORMWATER FOLLOW-UP INSP
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 11/24/2008 | STORMWATER FOLLOW-UP INSP | Approved | ||
| 09/05/2008 | STORMWATER FOLLOW-UP INSP | Partial Approval | NO STORMWATER CONCERNS | |
| 08/15/2008 | STORMWATER FOLLOW-UP INSP | Partial Approval | TRACK OUT CLEANED UP AND ROCK PLACED | |
| 08/14/2008 | STORMWATER FOLLOW-UP INSP | Correction Required | TRACK OUT INTO PARKING LOT NO SCE/SCE NEEDS MAINTENANCE BOB MOLLORY WITH SWPPP MAINT SVCS CALLED AND ADVISED SCE ROCK WILL BE DELIVERED TODAY AND SWEEPER WILL BE ON SITE TO CLEAN UP |
|
| 07/31/2008 | STORMWATER FOLLOW-UP INSP | Partial Approval | CONTROLS IN PLACE AROUND PERIMETER OF SITE | |
| 07/25/2008 | STORMWATER FOLLOW-UP INSP | Partial Approval | NO CONCERNS | |
| 07/15/2008 | STORMWATER FOLLOW-UP INSP | Partial Approval | DURING PH CONVERSATION WITH SUPER-TRACK OUT ON GOLF LINKS SWPPP MAINT SVCS WAS HIRED TO SWEEP VERIFIED CLEAN UP WORK ACCEPTABLE |
|
| 06/20/2008 | STORMWATER FOLLOW-UP INSP | Partial Approval | CONTROLS IN PLACE MET WITH TIM-NO CONCERNS AT THIS TIME |