Inspection History Details
Inspection Status: Approved
Inspection History: STORMWATER FOLLOW-UP INSP
Permit Number - T07BU02618
Inspection Description - STORMWATER FOLLOW-UP INSP
Inspection Status - Approved
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
06/16/2009 | STORMWATER FOLLOW-UP INSP | Approved | ||
02/10/2009 | STORMWATER FOLLOW-UP INSP | Partial Approval | NO STORMWATER CONCERNS | |
02/02/2009 | STORMWATER FOLLOW-UP INSP | Partial Approval | NO STORMWATER CONCERNS. PIA AND ROW WORK IN PROGRESS | |
01/20/2009 | STORMWATER FOLLOW-UP INSP | Partial Approval | NO STORMWATER CONCERNS | |
01/16/2009 | STORMWATER FOLLOW-UP INSP | Partial Approval | NO STORMWATER CONCERNS, STREET IS CLEAR OF SOIL | |
01/05/2009 | STORMWATER FOLLOW-UP INSP | Correction Required | NEEDS MORE GRAVEL ON S.C.E. | |
12/10/2008 | STORMWATER FOLLOW-UP INSP | Partial Approval | 1) PROVIDE MORE GRAVEL ON S.C.E. 2) SWEEP REMAINING SOIL AT CURB LINE |
|
12/03/2008 | STORMWATER FOLLOW-UP INSP | Correction Required | 1. PROVIDE 30' X 50' STABILIZED CONSTRUCTION ENTRANCE AT ALL TIMES. 2. REMOVE ALL SOIL BUILDUP IN LEE STREET AND CURBLINE. 3. UPDATE SWPPP TO SHOW MODIFICATIONS TO STABILIZED CONSTRUCTION ENTRANCE AND CONCRETE WASHOUT AREA. 4. CLEAN UP ND REMOVE CONCRETE WASHOUT AND PROVIDE A DESIGNATED CONCRETE WASHOUT LOCATION. 5. REPLACE STRAW WATTEL AT TEMPORARY CONSTRUCTION ENTRANCE. 6. REPLACE STAKES IN STRAW WATTLE WHERE MISSING ON THE PERIMETER |
|
11/04/2008 | STORMWATER FOLLOW-UP INSP | Partial Approval | NO STORMWATER CONCERNS | |
10/27/2008 | STORMWATER FOLLOW-UP INSP | Correction Required | MOST OF THE CORRECTIONS HAVE BEEN MADE. 1. REPAIR STRAW WATTLE ON WEST PERIMETER, PLACE STAKES AT 6' INTERVALS. 2. REMOVE DIRT FROM STRAW WATTLE ON EAST PERIMETER. 3. SWEEP STREET AND GUTTER LINE BOTH SIDES OF STREET. |
|
10/21/2008 | STORMWATER FOLLOW-UP INSP | Correction Required | SEE PREVIOUS COMMENTS | |
10/01/2008 | STORMWATER FOLLOW-UP INSP | Correction Required | 1. REPAIR STRAW WATTLE AT PERIMETER, PLACE STAKES AT 6' INTERVALS. 2. REMOVE DIRT FROM STRAW WATTLE ON WEST PERIMETER. 3. SWEEP STREET AND GUTTER LINE BOTH SIDES OF STREET. |
|
06/30/2008 | STORMWATER FOLLOW-UP INSP | Partial Approval | NO STORMWATER CONCERNS |