Inspection History Details
Inspection Status: Approved
Inspection History: ENGINEERING PRE-CONSTRUCTION
Permit Number - T07BU02618
Inspection Description - ENGINEERING PRE-CONSTRUCTION
Inspection Status - Approved
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
06/16/2009 | ENGINEERING PRE-CONSTRUCTION | Approved | ||
07/09/2008 | ENGINEERING PRE-CONSTRUCTION | Correction Required | NEED A CURRENT AZPDES CONST. GP AND SWPPP UPDATES. | |
06/26/2008 | ENGINEERING PRE-CONSTRUCTION | Partial Approval | ON SITE MEETING WITH QAIN QAIN, MIKE AMERSON (SURVEYOR) , AND MATT HAZEN AND DAVE MADDEN OF EAGLE ROCK EXCAVATING 1. DEVELOPER MUST PROVIDE A CURRENT AZPDES CONSTRUCTION GP. 2. FINISHED 24' PAAL WIDTHS AND PARKING SHALL BE MEASURED AT ASPHALT LEVEL. 3. COMPLETED PRE-CON FORM RECEIVED. |
|
06/09/2008 | ENGINEERING PRE-CONSTRUCTION | Partial Approval | PARTIAL PRE-CON, I REVIEWED SWPPP AND GRADING PLAN WITH QIAN QIAN SHAO 909-3381/VENTURE WEST. 1. POST AZPDES AUTHORIZATION, PERMIT AND PLANS ON-SITE. 2. OK TO USE STRAW WATTEL TO DETAIL PROVIDED. MUST CALL FOR INSTALL OF CONTROLS FOR DAY WHEN SITE GRUBBING OCCURS. PERIMETER GRUBBING AND SWPPP INSTALLATION SHALL OCCUR SIMULTANEOUSLY. 3. REVIEW PRE-CON DOCUMENT AND PROVIDE A COPY OF THE DOCUMENT TO THE INSPECTOR AT THE NEXT INSPECTION. |