Inspection History Details
Inspection Status: Approved
Inspection History: GRADING - INTERMEDIATE
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/14/2011 | GRADING - INTERMEDIATE | Approved | ||
| 06/15/2011 | GRADING - INTERMEDIATE | Continued | MET W/ SUPERINTENDENT , CHECKED FORMS FOR PEDESTRIAN ACCESS FROM ROW. RAMP SLOPE WAS OK. | |
| 06/14/2011 | GRADING - INTERMEDIATE | Continued | SIDEWALK CONSTRUCTED IN FRONT OF BLDGS ON SITE NEEDS RAILING IN TWO SPOTS / BOTH SPOTS THE SLOPE IS >5% BUT <8.3%. PEDESTRIAN ACCESS FROM ROW NEEDS TO BE NO GREATER THAN 8.3% AS SHOWN ON THE APPROVED GRADING PLAN. |
|
| 04/19/2011 | GRADING - INTERMEDIATE | Continued | MINIMAL SITE WORK ASSOCIATED WITH THIS PROJECT, HOWEVER CONTRACTOR MUST ENSURE PARKING, ACCESS, AND DRAINAGE PER APPROVED PLANS. DUE TO LIMITED SPACE, KEEP AN EYE ON DIMENSIONS AND SLOPES. |
|
| 03/31/2011 | GRADING - INTERMEDIATE | Continued | NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME | |
| 03/01/2011 | GRADING - INTERMEDIATE | Continued | NO SITE WORK CURRENTLY BEING CONSTRUCTED. ISSUE W/ADAAG-ANSI ACCESS NOT SOLVED. NO STORM WATER CONCERNS |
|
| 02/08/2011 | GRADING - INTERMEDIATE | Continued | PEDESTRIAN ACCESS FROM ROW TO EACH HOUSE IS NOT ADAAG/ANSI COMPLIANT. SIDEWALK SLOPES CONNECTING EACH HOUSE ARE >5% WITH A RISE > 6". SWEEP ADJACENT STREET, CLEAN UP CONCRETE WASH OUT |
|
| 01/06/2011 | GRADING - INTERMEDIATE | Continued | NO SITE WORK BEING DONE. CONTRACTOR ROUGH GRADING FOR RESIDENTIAL LOTS AND ROAD. NO STORM WATER CONCERNS AT THIS TIME |
|
| 11/08/2010 | GRADING - INTERMEDIATE | Not ready for Inspection | NO CONTACT, NO ACTIVITY ON SITE |