Inspection History Details
Inspection Status: Approved
Inspection History: STORMWATER FOLLOW-UP INSP
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/05/2009 | STORMWATER FOLLOW-UP INSP | Approved | ||
| 04/23/2009 | STORMWATER FOLLOW-UP INSP | Continued | NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME | |
| 04/13/2009 | STORMWATER FOLLOW-UP INSP | Continued | NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME | |
| 03/23/2009 | STORMWATER FOLLOW-UP INSP | Continued | NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME | |
| 02/24/2009 | STORMWATER FOLLOW-UP INSP | Continued | NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME. | |
| 01/09/2009 | STORMWATER FOLLOW-UP INSP | Correction Required | 1) SWEEP UP TACKED SOIL OFF OF PARKING AREA ON A ROUTINE BASIS (DAILY). 2) ENSURE STORM WATER MAINT SELF INSPECTIONS ARE PERFORMED AND DOCUMENTED PER YOUR SWPPP. 3) CLEAN OUT CONCRETE WASH OUT IT'S FULL |
|
| 11/18/2008 | STORMWATER FOLLOW-UP INSP | Correction Required | CONTRACTOR MUST CLEAN UP CONCRETE/ MATERIALS WASTE PILE ON SITE AND RE-ESTABLISH A DESIGNATED WASH-OUT PER YOUR STORM WATER PERMIT. CONTRACTOR MUST MAINTAIN SEDIMENT CONTROLS THROUGHOUT THE PROJECT. |