Permit: T07BU02580

Parcel: 11603197B

Inspection Status: Approved

Inspection History: STORMWATER FOLLOW-UP INSP

Permit Number - T07BU02580

Inspection Description - STORMWATER FOLLOW-UP INSP

Inspection Status - Approved

Date Description Inspector Results Comments
06/05/2009 STORMWATER FOLLOW-UP INSP Approved
04/23/2009 STORMWATER FOLLOW-UP INSP Continued NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME
04/13/2009 STORMWATER FOLLOW-UP INSP Continued NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME
03/23/2009 STORMWATER FOLLOW-UP INSP Continued NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME
02/24/2009 STORMWATER FOLLOW-UP INSP Continued NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME.
01/09/2009 STORMWATER FOLLOW-UP INSP Correction Required 1) SWEEP UP TACKED SOIL OFF OF PARKING AREA ON A ROUTINE BASIS (DAILY).
2) ENSURE STORM WATER MAINT SELF INSPECTIONS ARE PERFORMED AND DOCUMENTED PER YOUR SWPPP.
3) CLEAN OUT CONCRETE WASH OUT IT'S FULL
11/18/2008 STORMWATER FOLLOW-UP INSP Correction Required CONTRACTOR MUST CLEAN UP CONCRETE/ MATERIALS WASTE PILE ON SITE AND RE-ESTABLISH A DESIGNATED WASH-OUT PER YOUR STORM WATER PERMIT.
CONTRACTOR MUST MAINTAIN SEDIMENT CONTROLS THROUGHOUT THE PROJECT.