Inspection History Details
Inspection Status: Approved
Inspection History: ENGINEERING PRE-CONSTRUCTION
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 11/04/2008 | ENGINEERING PRE-CONSTRUCTION | Approved | 1) SILT FENCE HAS BEEN INSTALLED @ TOE OF SLOPE ALONG SOUTH BOUNDRY OF SITE. 2) ADD SEDIMENT LOGS AT SE CORNER OF SOUTH BOUNDRY (STORM WATER DISCHARGE POINT). LOGS SHOULD ACT AS A CHECK-DAM FOR STORM WATER. 3) POST A COPY OF YOUR NOI AT CONSTRUCTION TRAILER. 4) MAINTAIN SEDIMENT CONTROLS THROUGHOUT CONSTRUCTION. 5) DOCUMENT SELF INSPECTIONS REQUIRED BY YOUR STORM WATER PLAN. 6) STABILIZE SOUTH SLOPE AS SOON AS PRACTICABLE. 7) INSTALL DESIGNATED CONCRETE/MATERIALS WASH-OUT WFEN APPLICABLE. |