Inspection History Details
Inspection Status: Correction Required
Inspection History: STORMWATER INSTALL OF CONTROLS
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/15/2008 | STORMWATER INSTALL OF CONTROLS | Correction Required | Contractor needs to: 1- Install controls per manf. design. 2- Contractor needs to call in engineering pre-con inspection. 3- Approved drawing need to be kept on site durning construction. |