Inspection History Details
Permit: T07BU02480
Inspection Status: Approved
Inspection History: GRADING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/07/2009 | GRADING - FINAL | Approved | AS-BUILTS RECEIVED BY DAVID ROBERTS | |
| 03/06/2009 | GRADING - FINAL | Denied | NOT READY 1. PROVIDE FINAL REPORTS, AS-BUILT GRADING PLANS AND A LETTER OF CERTIFICATION FROM THE ARIZONA REGISTERED P.E. FOR COMPLIANCE WITH C.O.T. DEVELOPMENT STANDARD 11-01.16 AND THE GRADING NOTES 35,36 AND 37. |
|
| 02/23/2009 | GRADING - FINAL | Denied | NOT READY 1. PROVIDE FINAL REPORTS, AS-BUILT GRADING PLANS AND A LETTER OF CERTIFICATION FROM THE ARIZONA REGISTERED P.E. FOR COMPLIANCE WITH C.O.T. DEVELOPMETN STANDARD 11-01.16 AND TTHE GRADING NOTES 35,36 AND 37. 2. STABILIZE ALL DISTURBED SOIL SURFACES INCLUDING LOTS 9 & 10. 3. VERIFY THAT RETENTION/DETENTION BASIN BANKS ARE CONSTRUCTED TO DESIGN GRADE. 4. PROVIDE ROCK RIP RAP AT END OF ROADWAY N.E. OF LOT 5 AS SHOWN ON PAGE 7 OF THE GRADING PLAN. 5. CLEAN UP AND REMOVE ALL CONSTRUCTION MATERIAL AND DEBRIS INCUDING ALL ROPE AND STAKES ON THE PERIMETER. |
|
| 02/20/2009 | GRADING - FINAL | Cancelled | IVRS - RI canceled |