Inspection History Details
Inspection Status: Approved
Inspection History: GRADING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/02/2010 | GRADING - FINAL | Approved | ||
| 08/19/2010 | GRADING - FINAL | Continued | SITE WORK COMPLETED, CLEAN UP AND FINISHING OF INTERIOR OF BLDG BEING DONE. PROVIDE ENG CERT STATEMENT AND AN AS-BUILT PLAN FOR RECORDS, CALL FOR RE-INSPECTION. | |
| 08/10/2010 | GRADING - FINAL | Continued | A PRELIMINARY GRADING FINAL WAS COMPLETED AND A PUNCHLIST WAS GENERATED. 1) PROVIDE A DRAINAGE CERT STATEMENT FROM THE ENG OF RECORD STATING THAT THE SITE WAS CONSTRUCTED IN CONFORMANCE WITH THE APPROVED GRADING PLAN. 2) PROVIDE ALL REVISED/APPROVED PLANS FOR FINAL GRADING INSPECTION. 3) COMPLETE ALL SITE WORK SHOWN ON THE APPROVED GRADING/SITE PLANS TO INCLUDE SIDEWALKS, RAMPS, HC PARKING SPACES W/SIGNS, RE-SHAPE AND CLEAN OUT RET/DET BASINS, REMOVE ALL CONSTRUCTION DEBRIS, EQUIP AND MATERIALS, COMPLETE LANDSCAPING PER PLAN. 4) CALL FOR RE-INSPECTION WHEN COMPLETED. |
|
| 07/29/2010 | GRADING - FINAL | Correction Required | MET WITH THE CONTRACTOR, ENGINEER OF RECORD, AND THE STREETS DEPARTMENT REPRESENTIVE TO DISCUSS THE ISSUES OF THE HANDICAP ACCESS RAMPS OFF OF TWO OF THE SURROUNDING STREETS. THIS SOLUTIONS OF THE ISSUES WILL BE DRAWN AND SUBMITTED TO PAUL MACHADO AND RICHARD LEIGH FOR THE INITIAL APPROVAL AND THEN MADE NEED TO BE SUBMITTED TO OTHER DEPARTMENT MEMBERS. THERE IS AN ISSUE WITH THE CURRENT DESIGN LAYOUT WITH THE CURRENT WHEELCHAIR ACCESS RAMPS THAT IS CAUSING GRADE ISSUES. THE WORK FOR THESE TWO AREAS WILL BE HALTED UNTIL AN APPROVED SOLUTION IS PROVIDE TO THIS DEPARTMENT FROM THE REVIEWING STAFF MEMBERS. |