Inspection History Details
Inspection Status: Approved
Inspection History: GRADING - INTERMEDIATE
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/19/2010 | GRADING - INTERMEDIATE | Approved | ||
| 08/10/2010 | GRADING - INTERMEDIATE | Continued | A PRELIMINARY GRADING FINAL WAS COMPLETED AND A PUNCHLIST WAS GENERATED. 1) PROVIDE A DRAINAGE CERT STATEMENT FROM THE ENG OF RECORD STATING THAT THE SITE WAS CONSTRUCTED IN CONFORMANCE WITH THE APPROVED GRADING PLAN. 2) PROVIDE ALL REVISED/APPROVED PLANS FOR FINAL GRADING INSPECTION. 3) COMPLETE ALL SITE WORK SHOWN ON THE APPROVED GRADING/SITE PLANS TO INCLUDE SIDEWALKS, RAMPS, HC PARKING SPACES W/SIGNS, RE-SHAPE AND CLEAN OUT RET/DET BASINS, REMOVE ALL CONSTRUCTION DEBRIS, EQUIP AND MATERIALS, COMPLETE LANDSCAPING PER PLAN. 4) CALL FOR RE-INSPECTION WHEN COMPLETED. |
|
| 07/20/2010 | GRADING - INTERMEDIATE | Continued | SPOKE W/ SUPINTENDENT REGARDING ACCESS RAMP ALONG WEST SIDE OF BLDG. HAND RAILING REQUIRED ON BOTH SIDES OF RAMP W/ BARRICADE RAILING AND HAND RAILING AT TOP OF RAMP WHERE DOOR IS. | |
| 07/16/2010 | GRADING - INTERMEDIATE | Continued | MET W/ SUPERINTENDENT TO DISCUSS THE REQUIREMENT FOR HANDRAILING VERSES GUARD RAILING ALONG A RAMP AT THE WEST SIDE OF THE NEW BLDG. PER ICC/ANSI A117.1 2003: RAMPS: FOR A RISE > 6", HANDRAILS ARE REQUIRED HANDRAILS ARE REQUIRED ON BOTH SIDES OF THE RAMP MAX RISE ON ANY RAMP IS 30" HEIGHT OF TOP RAIL IS 34-38" MAX. OTHER STDS: STD DETAIL 105 - COT PIMA COUNTY 2003 EDITION/SHOWS BARRICADE RAILING, 42" TOP RAIL COT DEV STD 4.2 (RAMP SPECS): RAILING ON BOTH SIDES 30-34" TOP RAIL |
|
| 06/07/2010 | GRADING - INTERMEDIATE | Continued | 1) ELIMINATED ONE ACCESS WAY FROM ROW TO BLDG. TO INCLUDE SIDEWALKS AND HC RAMPS (NEED REVISED PLAN). 2) CHANGE FROM VERTICAL CURB TO EXTRUDED CURB ALONG EAST AND NE SIDE PARKING AREA. 3) PROVIDE A REVISED PLAN SHOWING ALL CHANGES MADE FROM THE ORIGINAL APPROVED PLAN, PRIOR TO FINAL GRADING APPROVAL. 4) PROVIDE ENGINEERING CERTIFICATION STATEMENT FROM THE ENGINEER OF RECORD STATING THAT THE STORM DRAINAGE SYSTEM AND RET/DET BASINS WERE COMPLETED PER THE APPROVED GRADING PLAN. 5) ENSURE STORM WATER MAINT INSPECTIONS ARE PERFORMED AND DOCUMENTED. 6) REMOVE TEMP SEDIMENT CONTROLS IN AREAS WHERE CURBING IS IN PLACE. |
|
| 05/25/2010 | GRADING - INTERMEDIATE | Continued | 1) CAN REMOVE STORM WATER CONTROLS (SILT SOCK) ALONG SPEEDWAY. 2) HAVE QUESTIONS ABOUT ROOF DRAINAGE FROM ADJACENT PROPERTY ALONG EAST SIDE OF SITE. 3) ENSURE SPOILS FROM FOOTINGS OF PERIMETER WALLS REMAIN ON SITE. CALL FOR ANY QUESTIONS OR CONCERNS. ( MIKE JOHNSON - CHESNUT 733-3300) |
|
| 03/02/2010 | GRADING - INTERMEDIATE | Continued | NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME. SWEEP UP TRACKING OFF OF SURROUNDING ROADWAYS. NO CHANGES TO SITE WORK. |
|
| 01/28/2010 | GRADING - INTERMEDIATE | Continued | CONTRACTORS ERECTING STEEL BLDG, NO SITE WORK COMPLETED EXCEPT FOR A SMALL BASIN ROUGHED IN. NO STORM WATER CONCERNS AT THIS TIME |
|
| 08/12/2009 | GRADING - INTERMEDIATE | Continued | SPOKE WITH SUPERINTENDENT, HE STATED THAT THE PROJECT WAS ON HOLD UNTIL FURTHER NOTICE, HE WOULD CONTACT ME WHEN WORK STARTS UP AGAIN. | |
| 07/21/2009 | GRADING - INTERMEDIATE | Continued | STORM WATER SEDIMENT CONTROLS ARE IN PLACE. SITE IS IN COMPLIANCE WITH THERE SWPPP. NO CONSTRUCTION ACTIVITY ON SITE. ROW ENTRANCES HAVE BEEN INSTALLED |
|
| 06/24/2009 | GRADING - INTERMEDIATE | Continued | CONTRACTOR DOING ROW WORK. OUTLET WIERS FOR NORTH RET BASINS HAVE BEEN INSTALLED. ENSURE ANY SPOILS OR TRACKING OF SOIL IS SWEPT BACK ONTO SITE. |